Part No. 4801-5120 Rev. 1-2020
Mega-Cool System
Page 13 of 48
Install Bottom Flashing and Drip Rails
1.
Place bottom flashing and drip rails along the cut in the pipe as shown.
NOTE
: If a Center-Mount In-Line Pump System is being installed, the high-
end drip rail should be installed as shown at left. The high-end drip
rail will ship with the center-mount In-Line Pump supply kit. Refer to
Supply Kit Numbers shown on Page 39.
2.
Secure the bottom flashing to the columns and stringers as shown.
Front View
Side View
(Center-Mount System ONLY)
High-End Drip Rail for
Center-
Mount 8” Tee
Place the short side
toward the wall.
Pipe
Screw
(Attach on 5’
Centers)
Drip Rail
Flashing
Secure Flashing
and Insert Drip
Rail Into Pipe)