Part No. 4801-5120 Rev. 1-2020
Mega-Cool System
Page 12 of 48
8” PVC Tee
(Center-Mount System
ONLY)
Cut Pipe to Allow for Pads
1.
At each pipe joint, put self-tapping screws on each side of 6.5" wide
parallel dotted lines printed on the pipe, as shown in diagram at left.
2.
Start cutting at least 2" (5 cm) from end of pipe as shown above. Cut
along the parallel dotted lines. Finish cuts at point where pads will stop.
NOTE: Do not cut pipe into Float Valve Tank slot. Stop 6” from Cover.
Do not cut pipe all the way to the end, as it will be impossible to
assemble the end cap!
3.
Remove and discard cut-out section of PVC pipe.
4.
If using 4" thick Pad, mark with chalk line, two parallel lines running
along the length of pipe. These lines should be at a distance apart of 4.5"
(11.43 cm) cm as measured along the outside of pipe. Then cut out
section of PVC pipe and follow note 2 and 3.
Stop cutting
6” from Float
Valve Cover
NOTE: When cutting pipe for
Center-Mount System,
ensure the 8” PVC Tee
and cut opening are at 90°
placement.
Put self-tapping screws on
each side of line at joints.
Opening in pipe is measured
along outside of pipe.
Side View
NOTE: Overlap joints of
pipe sections to make up
entire length of system.
Secure joints with screws as
shown.
6.5"(16.5 cm)for 6” thick PAD
4.5" (11.43 cm) for 4” thick PAD
Make cut
as shown
below.
Side View
Front View
Cut
reservoir
To length of
Pads.
Start cutting
2" (5.1 cm)
from outside
edge of
post.