All input and output connections to the circuit board are 24 Volt or less.
Although the cables do not have to be run in conduit, it is necessary that long runs of cable be supported or protected by
strapping them to the equipment piping. If conduit will be used to route the shielded cables, three factors must be consid-
ered:
1. Keep cables at least six (6) inches away from 120 Volt or higher electrical circuits.
2. GROUND the conduit (if metallic) to a known “earth ground” location.
A series of holes are located on the sides and bottom of the DI Controller (see Figure 10). Strain relief fittings are provided
with the controller enclosure for interconnecting wiring. Install the plastic fittings as needed. Remove the compression nut
and rubber sleeve from each fitting. Prior to connection of the cable wires to the circuit board, slide the compression nut
and sleeve over the cable for the wiring connections. When wiring is completed, apply a small amount of silicone to the
rubber sleeve and reassemble. This will assure all wiring is secure and assist in making the tightening of the fitting easier.
Insert the plugs provided to block any holes not used for wiring or other accessories.
NOTE AP = Anion tank pump,
not
acid pump. CP = Cation tank pump,
not
caustic pump.
SOLENOID
MANIFOLD
01023880
FLOW METER,
MODEM, TDS
CONTROL
01023499
A6
C5
AP
CP
Figure 10.
Deionizer cable routing.