PPP modem 

Follow the step by step instruction below to configure PPP over 3G 

 

Under 

Configuration

Interface

General

, select WAN=

”Wireless” 

 

 

Under 

Configuration

Interface

PPP modem

, enter 

APN

 applicable for the selected 3G 

operator. Remaining fields can usually be left empty. 

 

Push the “save” button (at the bottom of the page).

 

 

 

Figure 12 3G Configuration 

 

WWAN modem 

WWAN is a specific 3G-mode. WWAN tends to be more robust than PPP described in previous chapter. 
Follow the step by step instruction to configure WWAN. 

 

Under 

Configuration

Interface

General

, select WAN=

Wireless

” 

 

 

Under 

Configuration

Interface

WWAN

, enter 

APN

 applicable for the selected 3G 

operator. Remaining fields can usually be left empty. 

 

Push the “save” button

 (at the bottom of the page). 

6.3

 

Current limit 

From the local web interface is the max current limit configured (in case the limit shall be lower 

than the charging status fuse level). Under configuration outlet, see Figure 13 is the current limit 

set. 

Содержание E-MOBILITY CHARGESTORM Connected

Страница 1: ...document Read and follow the instructions in this document before installation and usage of the product Installation must fulfill local safety regulations 3 Delivery content Part of delivery Charging...

Страница 2: ...available for use inside CHARGESTORM Connected Make sure that power is off during installation 4 3 Network connection In case CHARGESTORM Connected shall be connected to a portal or a local controlle...

Страница 3: ...ing CHARGESTORM Connected in direct light sunlight Symbol visibility is limited and heat in the unit is increasing CHARGESTORM Connected has a temperature sensor in the unit that adjust charging curre...

Страница 4: ...le gland for 1 that is delivered with the product supports cable dimensions between12 22mm while the gland for 2 supports 3 6mm The glands must be replaced if the cables are outside specified range If...

Страница 5: ...e end The wires cross section area must not exceed 16mm2 Make sure protected ground wire is longer than the other wires sot that it will be the last wire to detach if pulled Connect the supply wires t...

Страница 6: ...nect cable to RJ45 connector on the control board located on the front panel When cable is connected in both ends shall link and activity led on the RJ45 connector be active If 3G is in use check that...

Страница 7: ...dard USB port is used on the computer for configuration If the computer is running Microsoft Windows must an Ethernet to USB driver be installed to support access to the local web interface For Linux...

Страница 8: ...r Configuration interfaces When network configuration is ready check on the status page that internet access is established Ethernet To set the IP settings for Ethernet follow the instruction below Un...

Страница 9: ...WWAN is a specific 3G mode WWAN tends to be more robust than PPP described in previous chapter Follow the step by step instruction to configure WWAN Under Configuration Interface General select WAN W...

Страница 10: ...owing format wss companyname oamportal com Ocpp websocket Chargeboxid must not contain more than 22 characters and it must be unique charging stations cannot have the same chargeboxid CHARGESTORM Conn...

Страница 11: ...D tags that shall be activated on CHARGESTORM Connected 7 Product information Power input Power 16 32A 230V 1 phase or 16 32A 400V 3 phase 50Hz Power input connector depends on model Charging current...

Страница 12: ...intenance of CHARGESTORM Connected shall be conducted at least once per year At installation and maintenance of CHARGESTORM Connected shall the following tests be performed Test Trip ground circuit br...

Страница 13: ...Installation manual CHARGESTORM Connected page 13 11 Electrical schematics 11 13 phase Below is an example of a schematics for CHARGESTORM Connected 3ph dual outlet...

Страница 14: ...Installation manual CHARGESTORM Connected page 14 11 1 IT nett Below is an example of a schematics for CHARGESTORM Connected 1ph dual outlet IT nett...

Страница 15: ...orrect in the manual CTEK E Mobility is not responsible for faults or incidents or damages that can be traced to the usage of this manual Copyright CTEK E Mobility All rights restricted copying adapti...

Отзывы: