13
3
–
FOAM CONCENTRATE TANK DOSING :
Connect a lance on the pre-mix output.
The flow and pressure are displayed [
1
] and [
5
].
Start the engine of the GECKO.
Select the type of fire using the concentration selection keys
T7
to
T8
.
Système prime automatically (min. 2s).
The concentration (%) and the injection pressure appears on the screen [
2
] and [
4
].
Dosage begins if the flow rate is greather than 100L/min.
The box displays
«
Water flow is too weak
»
if the ratio of water flow / product flow is
lower than the minimum performance of dosing system
The box displays
«
Water flow is too strong
»
if the flow ratio of water / product flow is
higher than the minimum performance of dosing system.
At any time, the system beeps, a fault is detected and displayed :
- « Injection fault»: The injection pressure has remained under the water pressure
during more than 15 seconds. Try again. If the problem persists, contact our after
sales service.
- « Additive presence fault »:
The priming was not done correctly. Try again. If the
problem persists, contact our after sales service.
To stop the dosage, press the key «
STOP
»
T1
.
Flushing is done automatically.
At any moment it is possible to reselect an intervention by simply pressing the desired
type of fire.
7
- Foam
concentrate
tank level
2
4
5
1
T3 T4
T7 T8
T5 T6
Intervention procedure
Содержание Iguane 120-30
Страница 1: ...Version 1 21 01 16 Fire fighting IGUANE Range USER MANUAL IGUANE 120 30...
Страница 2: ...2...
Страница 5: ...5 PRESENTATION OF THE IGUANE...
Страница 8: ...8 HYDRAULIC DRAWING...
Страница 10: ...10 INTERVENTION PROCEDURE...
Страница 21: ...21 ANNEXES...
Страница 22: ...22 Motor OMR80 Option...
Страница 28: ...28 PURGE OF THE FILTER CAMELEON Open the valve of the suction filter Filter valve Cameleon...