140
CTC EcoLogic M/L
10. Electrical installation
Installation and connections in CTC EcoLogic must be performed by a
licenced electrician. All wiring shall be installed according to applicable local
requirements.
10.1
High voltage
Supply
230 V 1N~
Max fuse size (group fuse) 10A.
Connects to terminal block marked L1, N, PE
All-pole safety switch
The installation should be preceded by an all-pole safety switch according to
overvoltage category III, which ensures disconnection from all electric power
sources.
10.1.1
Mixing valves (Y1, Y2, Y3, Y4)
230 V 1N~
1.5 m cable, 1.5 mm², neutral, open, close.
The mixing valve motors are connected to the PCB/terminal block:
(Y1) Mixing valve 1
Open:
pole A27
Close:
pole A28
Neutral:
pole A29
(Y2) Mixing valve 2
Open:
pole A15
Close:
pole A16
Neutral:
pole A17
(Y3) Mixing valve 3, expansion card X6*
Open:
pole 12
Close:
pole 13
Neutral:
pole 14
(Y4) Mixing valve 4, expansion card X7*
Open:
pole 18
Close:
pole 19
Neutral:
pole 20
Check that the open and close signals are correctly connected by testing the
motor in the "Installer/Service/Function Test" menu in the control system.
*Only applies to CTC EcoLogic L.
Содержание EcoLogic L
Страница 2: ......
Страница 3: ...162 505 61 2 2021 02 25 Installation and Maintenance Manual CTC EcoLogic L M ...
Страница 136: ...136 CTC EcoLogic M L 9 Valves ...
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 505 61 2 2021 02 25 ...