7. 

 

Connect the compressed air to be treated to 
the drier inlet (lower port) with pipes which do 
not place stresses and strains on the appliance.  

8. 

 

The compressed air to be treated must be taken 

from the upper part of the tanks to reduce the 

risk of transporting liquid phase water or 

particles. This will extend the service life of the 

appliance.  

9. 

 

Connect the treated compressed air to the 
exhaust side of the drier with pipes which do not 
place stresses and strains on the appliance. 

10. If the compressed air production system is not 

fitted with a safety device (valve or pressure 

switch) you must fit a safety valve to each tank 

They must act directly on the tank with no 

intermediate position and possess a discharge 

capacity higher than the quantity of air inlet to 

the tanks, calibrated and sealed at the safety 

pressure of your network which must always be 

under 20 bars.  

11. Check all connections for leaks.  

12. Connect the drier and filter purge lines to your 

condensate treatment system (water/oil 
separation).  Unless otherwise stipulated by 
applicable legislation, do not drain wastes to 
sewers without prior treatment.  

* see ISO standard 8573-1   

 

 

For air dryer inlet and outlet connexion's tightening, be sure not to use too much screwing tight power 

which would damage the evaporator coil piping of the thermal mass. 

Typical layout  

3.4

 

Electric connection  

Risk of electric shock:  the circuit must be wired by a qualified electrician in compliance with applicable 

legislation and the specifications of the appliances to be connected.   

Check that voltage and frequency comply with the values shown on the manufacturer's plate on the 
machine and that they are within the tolerances shown on the electrical circuit diagram.   

Check that the electrical installation complies with laws and regulations current in the place where the drier 
will be installed.  Only use the electric cable provided with the machine or equivalent.  

At the entry of the electric cable, a safety device must be installed for:   

 

Protection from short-circuits and voltage surges;   

 

Protection from the indirect contacts on the machine (short-circuit between phase and equipotential 
safety circuit) by automatically power supply cut-off as stipulated in IEC standard 364 - HD384  IEC 64-8;   

 

Protection from the failure of one phase in a three-phase electric installation.  

For safety circuit dimensions, refer to the data shown in the electric diagram (maximum current, peak current, 
cable cross-section).  

 

 

 

P 

S 

Treated 

compressed

 

Air 

Water 

Oil 

Air compressor 

Tank 

Up-

stream 

Filter 

Down 

stream 

filter 

 

 By-pass 
valve 

Condensate 

separator 

Upstream 

valve 

Down 

stream 

valve 

Содержание MASTERIA MPE 004

Страница 1: ...of the Air ZA du caillou 3 rue Jules Verne 69630 CHAPONOST FRANCE Phone 33 0 4 78 56 70 70 Fax 33 0 4 78 56 17 31 Instruction Manual MASTERIA compressed air dryer INSTALLATION USE MAINTENANCE Models...

Страница 2: ...ce 9 5 2 Changing set points 9 5 3 Changing purging duration 10 5 4 Purge test 10 5 5 Choice temperature unit 11 6 Maintenance preparation 11 6 1 Shut down and close all circuits 11 6 2 Access inside...

Страница 3: ...due to an air to air heat exchanger in all models in the range above the MPE010 The dry cold air from the drier is used to pre cool the hot wet air inlet Mechanical separation guaranteed in all opera...

Страница 4: ...s install manual valves so each machine can be isolated separately Fit a safety valve to each tank or appliance containing air at a pressure higher than atmospheric pressure Fit a safety valve between...

Страница 5: ...PROGRESS DO NOT ENERGISE warning panel Do not touch the master switch and do not try to start the drier if the warning panel is in place 3 Close the by pass valves up and down stream from the drier an...

Страница 6: ...ratures are specified on the manufacturer s plate on the drier Unless otherwise stated dryers are designed to function in ambient conditions at a temperature of 25C Higher temperatures may reduce the...

Страница 7: ...or treatment see ISO standard 8573 1 For air dryer inlet and outlet connexion s tightening be sure not to use too much screwing tight power which would damage the evaporator coil piping of the thermal...

Страница 8: ...inutes and will only start again when the digital display panel indicates 04 C or 39 F If the compressed air flow oscillates it is normal for these values to be exceeded temporarily 10 Check that the...

Страница 9: ...unit s electronic regulation LEDs 4 LEDs indicate the operating condition of the drier or the regulation 5 2 Changing set points General The factory programmed set point normally meets the nominal ca...

Страница 10: ...on value flashes on the digital display panel Use the buttons to modify the purging duration value The adjustment range is from 1 to 10 seconds To record the new value wait 5 seconds without pressing...

Страница 11: ...liance OFF as stipulated in 4 1 Lock the power supply cut out switches OPEN Lock the upstream and downstream valves CLOSED and the by pass valve OPEN Check that the appliance is depressurised by press...

Страница 12: ...variation in pressure could damage the drier 3 Slowly open the upstream valve 4 Slowly close the by pass valve 7 Maintenance operation Various risks electrocution explosion The following operations m...

Страница 13: ...to the solenoid purge valve 10 Open the manual valve on the purging line You must comply with the recommendations at the beginning of this chapter 8 Test and maintenance scheduling Frequency of interv...

Страница 14: ...er 9 Alarm When temperature sensor is broken or short circuited the first digit point see diagram 5 1 will blink and the display show value 00 In the same time the compressor of the drier cut off Repl...

Страница 15: ...low through the drier The condensates have frozen and block the passage as the probe is incorrectly positioned Compressed air does not flow through the drier Position the probe in the centre of the DT...

Страница 16: ...a high evaporation pressure of raised and higher purging from the separator Correct the temperature and the air flow to pre set limits Press the red button on the Pressure switch cap F Low pressure L...

Страница 17: ...5 1 1 1 3 1 5 1 85 2 2 2 4 2 8 3 2 3 50 Refrigerant Fluid R134a R407c Load gr see on the data sticker at the back panel HP Pressure switch bar 18 26 Manual Reset LP pressure controller bar 1 automatic...

Страница 18: ...the operations described in 4 3 and 4 4 must be carried out Your Mast ria drier is pre fitted for an external purge with a level detection system To connect this type of purge you must 1 Raise your d...

Страница 19: ...4A Label Components 006 020 025 125 AO Compressed air exhaust AI Compressed air inlet CD Condensing unit CF Condensate filter CO Condensate discharge CP Compressor CS Condensate separator CT Capillary...

Страница 20: ...ng 14 2 Wiring diagrams SE00148 SE0015 SE0018 SE0017 and SE0018 Label Components M1 Compressor M2 Fan motor EC Electronic card EV Solenoid purge valve HPS High pressure switch LPS Low pressure switch...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Отзывы: