© Gamajet Cleaning Systems, Inc. 10/24/01
3. PREVENTATIVE MAINTENANCE
Note:
A rigorously implemented preventative maintenance program will significantly
reduce repair costs over the life of the Gamajet. The foundation of such a program is
regularly scheduled inspections to discover and replace worn or damaged parts before
they can cause the failure of other, more costly, components. The inspection intervals
required will depend on the severity of the application, but 100 hours is recommended
initially.
Note:
Reference
numbers appearing below may be used to identify parts on the exploded
view in Appendix B .
3.1 STORAGE
The Gamajet should be washed out with clean water after each use to remove any foreign
material or soft substances left in the machine that may harden during storage and cause
the Gamajet to
seize or lock up. A clean water rinse through the Gamajet will also wash
out any residues of chemical cleaners or recirculated wash water that could adversely
affect the seals and O-rings during prolonged contact in storage. The best position to
store the Gamajet is to stand it up side down with the inlet connection facing down.
3.2 GEARBOX MAINTENANCE
3.2.1 Disassemble the machine by following the instructions in section 2.2.
3.2.2 Inspect the condition of the Gearbox. If cleaning solution is present, refer to
section 2.3.3 Gearbox and disassemble the Gamajet to replace the Seal #12 and other
parts as required. If the Gearbox is free of contamination, go to step 3.2.3.
3.2.3 Reassemble the machine.
3.2.4 Return the machine to service.
3.3 INSPECTION INTERVALS
The Gamajet V should be inspected every 100-300 hours of operation, depending on the
severity of use. An interval of 100 hours is recommended initially.
3.4 TIPS
3.4.1 All the Bearings, Bushings, Seals and O-rings are wear parts. Ideally, they should
all be replaced,
as a group
, every 300-40/#600 hours of operation, depending on the
severity of use. At first, an interval of 300 hours is recommended.
Содержание GamaJet V
Страница 27: ...GAMAJET V UPDATE ASSEMBLY PROCEDURE EXPLODED VIEW ...
Страница 29: ...STEP 2 GAMAJET V GEAR TRAIN ASSEMBLY EXPLODED VIEW 8 541 8 511 AS 8 522 AS 8 513 8 514 3 4 6 8 23 8 512 5 ...
Страница 30: ...STEP 3 GAMAJET V GEARBOX ASSEMBLY EXPLODED VIEW GEAR TRAIN ASSEMBLY 8 501 8 530 1 2 ...
Страница 35: ...STEP 7 GAMAJET V NOZZLE HOUSING ASSEMBLY EXPLODED VIEW 8 505 AS 8 507 AS 8 518 8 519 41 42 45 8 549 49 ...