Table 4.2: Clearances From Vent Piping To Combustible Construction
TYPE OF VENT PIPE
PIPE DIRECTION
ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
MATERIAL
80/125 and 60/100mm
CONCENTRIC VENTING
VERTICAL OR
HORIZONTAL
ENCLOSED ON ALL FOUR SIDES
0”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL OR
HORIZONTAL
AT LEAST ONE SIDE OPEN,
COMBUSTIBLE MATERIAL ON A
MAXIMUM OF THREE SIDES
1”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
HORIZONTAL OR VERTICAL
WITH OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL WITH NO OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2”
5
Содержание BIMINI BUDDY BWC090
Страница 2: ......
Страница 9: ...7 Figure 5 1 Wall Mounting Hole Locations ...
Страница 10: ...Figure 5 2 Boiler Mounting Hardware 8 ...
Страница 25: ...FIGURE 7 21 DIMENSION L 23 FIGURE 7 20 INSTALLATION OF REDUCING ELBOW ON CONCENTRIC BOILER COLLAR ...
Страница 35: ...FIGURE 7 35b CUTTING VERTICAL TERMINAL FIGURE 7 35c COMPLETING VERTICAL TERMINAL INSTALLATION 33 ...
Страница 43: ...FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT 41 ...
Страница 56: ...54 Figure 10 1 Wiring Connections Diagram ...
Страница 57: ...55 Figure 10 2 Ladder Diagram ...
Страница 58: ...56 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 76: ...74 ...
Страница 79: ...77 ...
Страница 80: ...78 ...
Страница 81: ...79 ...
Страница 82: ...80 ...
Страница 84: ...82 150 151 152 153 154 155 ...
Страница 85: ...83 156 157 158 159 160 161 ...
Страница 86: ...162 84 ...