3) Joining Pipe -
a) Start assembly of the vent system at the boiler. Lubricate the brown gasket in the boiler vent collar with a few drops
of water.
b) Push the male end of the first fitting into the boiler collar until it bottoms out. The male end of cuttable sections
should go 1” into the collar until the insertion mark (made in Step 2d above) is covered. On other fittings, the bead
on the male pipe will bottom out on the collar (Figure 7.32b).
c) The male end of cuttable fittings must be held to the collar with three #10 x 1/2” sheet metal screws. Drill a 1/8 hole
through both outer pipes to start this screw.
Use a drill stop or other means to ensure that the drill bit does not
penetrate more than 3/8” into the outer pipe. Do not use a sheet metal screw longer than 1/2”
(Figure 7.32a).
d) Use locking bands (provided with all fittings) to secure non-cuttable pipe, as well as fittings, to the boiler collar
(Figure 7.32b).
e) Use the same method to join all remaining vent components except for the terminal.
FIGURE 7.32a: JOINING CUTTABLE PIPE
FIGURE 7.32b: JOINING NON CUTTABLE PIPE
28
Содержание BIMINI BUDDY BWC090
Страница 2: ......
Страница 9: ...7 Figure 5 1 Wall Mounting Hole Locations ...
Страница 10: ...Figure 5 2 Boiler Mounting Hardware 8 ...
Страница 25: ...FIGURE 7 21 DIMENSION L 23 FIGURE 7 20 INSTALLATION OF REDUCING ELBOW ON CONCENTRIC BOILER COLLAR ...
Страница 35: ...FIGURE 7 35b CUTTING VERTICAL TERMINAL FIGURE 7 35c COMPLETING VERTICAL TERMINAL INSTALLATION 33 ...
Страница 43: ...FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT 41 ...
Страница 56: ...54 Figure 10 1 Wiring Connections Diagram ...
Страница 57: ...55 Figure 10 2 Ladder Diagram ...
Страница 58: ...56 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 76: ...74 ...
Страница 79: ...77 ...
Страница 80: ...78 ...
Страница 81: ...79 ...
Страница 82: ...80 ...
Страница 84: ...82 150 151 152 153 154 155 ...
Страница 85: ...83 156 157 158 159 160 161 ...
Страница 86: ...162 84 ...