Figure 6.1: Boiler Installed In A Confined Space, Ventilation Air From Inside
• If the total volume of both the boiler room and the room to which the openings connect is less than 50 cubic feet
per 1000 BTU/hr of total appliance input, install a pair of identical openings into a third room. Connect addi-
tional rooms with openings until the total volume of all rooms is at least 50 cubic feet per 1000 BTU/hr of input.
• The “free area” of an opening takes into account the blocking effect of mesh, grills, and louvers. Where screens
are used, they must be no finer than ¼” (4 x 4) mesh.
Step 2b: If the boiler is to be placed in an
unconfined space the natural infiltration into the boiler room will
provide adequate air for ventilation without additional openings into boiler room.
10
Содержание BIMINI BUDDY BWC090
Страница 2: ......
Страница 9: ...7 Figure 5 1 Wall Mounting Hole Locations ...
Страница 10: ...Figure 5 2 Boiler Mounting Hardware 8 ...
Страница 25: ...FIGURE 7 21 DIMENSION L 23 FIGURE 7 20 INSTALLATION OF REDUCING ELBOW ON CONCENTRIC BOILER COLLAR ...
Страница 35: ...FIGURE 7 35b CUTTING VERTICAL TERMINAL FIGURE 7 35c COMPLETING VERTICAL TERMINAL INSTALLATION 33 ...
Страница 43: ...FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT 41 ...
Страница 56: ...54 Figure 10 1 Wiring Connections Diagram ...
Страница 57: ...55 Figure 10 2 Ladder Diagram ...
Страница 58: ...56 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 76: ...74 ...
Страница 79: ...77 ...
Страница 80: ...78 ...
Страница 81: ...79 ...
Страница 82: ...80 ...
Страница 84: ...82 150 151 152 153 154 155 ...
Страница 85: ...83 156 157 158 159 160 161 ...
Страница 86: ...162 84 ...