5.10
Pegasus BT-POM 1212 - Rev 3
Lubrication & Maintenance
Periodical Maintenance
1. Check springs(A) [New SF only] and B) shown in figure 4 above;
replace them if flattened or damaged.
2. Check springs (B) shown in figure 5 above; replace them if yielded.
3. Periodically check all hydraulic hoses and fittings for wear and
replace if necessary.
End of Season Maintenance
1. Before storage clean all equipment thoroughly.
2. If necessary protect sprayer plumbing components with
anti-freeze fluid to avoid damage in severe temperatures.
Booms
For boom alignment & adjustment refer
to pages 3.12 to 3.16.
NOTE
Содержание PEGASUS 4000
Страница 26: ......
Страница 69: ...5 3 Pegasus BT POM 1212 Rev 3 Section 5 Grease Point Diagrams Boom Grease Points Chassis PTO Grease Points ...
Страница 78: ...5 12 Pegasus BT POM 1212 Rev 3 ...
Страница 101: ...7 13 Pegasus BT POM 1212 Rev 3 Section 7 PLEASE TURN TO THE NEXT PAGE ...
Страница 110: ...7 22 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings Chassis Tank Wheels ...
Страница 121: ...7 33 Pegasus BT POM 1212 Rev 3 Section 7 Plumbing Diagram AR180 ...
Страница 122: ...7 34 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings Plumbing Diagram AR250 280 ...
Страница 138: ...7 50 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings GBCOMPL 24 28CA Centre Section 24 28m ...
Страница 146: ...7 58 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings GBCOMPL 285 LHorRH BoomNonGvar28m 7 8 5 8 C ...
Страница 152: ...7 64 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings GBCOMPL 30C Centre Section 30m 8 1 ...
Страница 158: ...7 70 Pegasus BT POM 1212 Rev 3 Assembly Drawings Parts Listings AB19100 AA 33 36m Centre Section Hanger V2 ...
Страница 165: ......
Страница 166: ......
Страница 167: ......