2. Unplug the 2-Series integrated dual bus control system and leave it
unplugged for about 10 seconds.
3. Plug the unit in and observe the statistics displayed within the
Viewport. The program name uploaded into the system also appears.
4. Verify the displayed information against what was originally loaded in
the previous section.
Loading Touchpanels
A VTZ file is the format associated
with TPS touchpanel projects. All
other touchpanels use the HEX
format.
The 2-Series integrated dual bus control system may include one or more
touchpanels. Each panel must be set to the proper network ID and loaded with a
touchpanel
project
in order to work properly in conjunction with the system program
loaded in "Loading the System Program" on page 34. For each panel in the system, a
separate HEX or VTZ file describing the graphical elements of the panel is required.
In some cases, where two or more panels are to be identical in usage, a single HEX
or VTZ file may be used for multiple panels. To load a touchpanel project into the
panel, use the Crestron Viewport or the “Upload Project” function in VisionTools™
Pro-e. For consistency, the steps that follow this paragraph use the Viewport. To
upload a HEX or VTZ file into the touchpanel, complete the following steps in the
order provided.
1. Verify that the touchpanel is connected to the 2-Series integrated dual
bus control system via the appropriate network cable. Also, verify that
the touchpanel is set to the proper network ID. (This info should be
available in the system connection sheets or directly from the
programmer.)
2. Select
Tools | Viewport
to open the Crestron Viewport, if it is not
already opened.
3. Select
Diagnostics |
Report Network Devices
(alternatively, depress
F4
) and verify that the touchpanel to be loaded reports back and is at
the expected network ID.
4. Select
File Transfer |
Send Touchpanel
(alternatively, depress
Alt+T
)
and set the network ID to the ID of the touchpanel to be loaded.
5. Browse for the supplied HEX or VTZ file and click the
Open
button.
The file is sent to the control system and then over the network to the
touchpanel. Verify that the panel displays a message saying that the
upload is in progress.
Updating the Control System
Each 2-Series integrated dual bus control system contains an operating system (also
known as OPS) that from time-to-time must be updated. It is often necessary to
update a control system if new features have been implemented (such as support for
new hardware or new language constructs) or if bugs have been corrected. New
updates are made available as a CUZ file (or Control System Update Package). The
following procedure is recommended to load a new CUZ file into the 2-Series
integrated dual bus control system:
NOTE:
CUZ files only pertain to 2-Series control systems. CUZ files are not used
for older models such as X generation control systems, the CNRACK, CNMS,
CNLCOMP-232, or the ST-CP. Consult the appropriate documentation for each of
these products to perform updates.
36
•
Integrated Dual Bus Control System: PRO2 & AV2
Operations Guide - DOC. 5957
Содержание 2 Series
Страница 1: ......