
36
Fig. 2
Project File Management
F1
New Project
Starts a new project, prepares the GUI by clearing the Device List of all devices, including ones
currently connected to the network. See Fig. 16
Fig. 16
If you click “Yes”, a dialog Window will pop-up, as shown below in Fig. 3. The device ID’s will be
different, but the general format will be the same.
Fig. 3
When you click “Yes”, a Connect Device dialog window comes up, as shown in Fig. 4