background image

© Copyright 2004, Creative Playthings, Printed in U.S.A.

PINNACLE ROCK WALL
19652-400 Rev F (05-20)

Page 4

ASSEMBLY INSTRUCTIONS

1/4"

Typical

Top Rope 

Board (E)

#10 x 2-1/2" T25 

Deck Screw

37-3/4"

Rock Board

Spacer 

Board

Center

Rail

5-1/2"

1-1/2"

ideal

Align

Bottom View

Center

Rail

STEP 5 — Attach Center Angled Rail:

Attach the Center Rail (B) to the center of the back of the 

boards. Align the bottom of the Center Rail with the bottom 

of the two outside Rails. Fasten the Center Rail using #10 x 

2-1/2" T25 Deck Screws from the front of the Rock Climber. 

Drill a 1/8" diameter pilot hole for each screw.

STEP 4 — Assemble Rock Wall:

Set the two Angled Rails (A) approximately 37-3/4" apart.  

Fasten a Rock Board (C) 5-1/2" from the top of the Angled 

Rails using four #10 x 2-1/2" T25 Deck Screws. Make sure to 

leave enough space for the Top Rope Board. The Rock Board 

must be at a right angle to the Rails. 

Drill a 1/8" diameter 

pilot hole for each screw.

Starting at the top, lay out the remaining Rock Boards and 

Spacer Boards (D) in the pattern shown in the illustration, 

alternating the direction of the holes in the Rock Boards. Leave 

1/4" to 3/8" gaps between the boards. The shaft of a 1/4" Bolt 

or 1/4" Weld Nut can be used to gauge the gaps. Use four 

#10 x 2-1/2" Deck Screws to fasten each board. Leave off 

the Top Rope Board (E), at the top of the Rock Climber, until 

the unit is fastened to the gym. 

Drill a 1/8" diameter pilot 

hole for each screw.

Содержание SH304-101

Страница 1: ...onjunction with any option that would fasten to the rear wall of a Playset All the Hand Holds supplied must be fastened to your Rock Wall There should be no unused mounting holes left on the Rock Wall Unused holes could present a finger entrapment hazard to your child Keep Hand Holds clean so that they can be inspected for cracks and sharp edges Replace any damaged Hand Holds Replace any bolts or ...

Страница 2: ... in place Using the 5 16 x 2 1 2 Hex Bolt Assemblies from the original Tent Post fasten the Center Post I to the End Tent Support Re fasten the Center Tent Pipe Use a level to make sure the Center Post is plumb Drill a 3 8 diameter hole through the hole in the bottom of the Center Post and then through the Platform End Fasten the Center Post using one 5 16 x 3 Hex Bolt Assemblies Restore Wall Slat...

Страница 3: ... Gym It is not needed on Skybox installation STEP 2 Attach Bench Step to Playset Place the assembled Bench Step along the Rear Wall of your Playset Make sure it sits flat against the Rear Wall and the Floor Boards Fasten the Bench Step to the Rear Wall in at least four places using 8 x 2 1 2 Phillips Head Screws through the Wall Slats into the back of the Bench Seat from the back of the Gym Fasten...

Страница 4: ...ock Wall Set the two Angled Rails A approximately 37 3 4 apart Fasten a Rock Board C 5 1 2 from the top of the Angled Rails using four 10 x 2 1 2 T25 Deck Screws Make sure to leave enough space for the Top Rope Board The Rock Board must be at a right angle to the Rails Drill a 1 8 diameter pilot hole for each screw Starting at the top lay out the remaining Rock Boards and Spacer Boards D in the pa...

Страница 5: ... Bracket can be mounted to the inside or outside of the Angled Rails Support drill holes STEP 8 Attach Rock Climber Lean the Rock Climber Assembly into place against the Support in the position desired Position the Access Ladder Brackets with one surface flat against the surface of the Plat form Support Mark the position of the holes in the Brackets onto the Support If the Access Ladder Bracket is...

Страница 6: ...Board to the Angled Rails Thread the Bolts through the Top Rope Board the Angled Rails and into the Weld Nuts inserted in step 4 Finish securing the Top Rope Board using four 10 x 2 1 2 T25 Deck Screws Drill a 1 8 diameter pilot hole for each screw Hex Bolt Hex Bolt Lock Washer Lock Washer Flat Washer Flat Washer Weld Weld Nut Nut STEP 11 Fasten Climbing Rocks Fasten a Climbing Rock K to each pair...

Страница 7: ...Top Rope Board E and the hole that was drilled in Step 9 Pull the Rope through the holes and tie a knot in the end as shown in the illustration Pre stretch the rope before tieing the bottom end The bottom end of the Rope MUST be installed under the bottom spacer Board and through the hole in the Center Rail Pull the Rope through the hole until it is tight and tie a knot in the end as shown in the ...

Страница 8: ...6 36 17003 609 Hex Bolt 1 4 x 1 1 2 2 17003 1609 Bolt Hex 1 4 x 4 6 17003 611 Hex Bolt 5 16 x 1 1 2 1 17003 1211 Hex Bolt 5 16 x 3 38 12017 205 Lock Washer 1 4 7 12017 206 Lock Washer 5 16 3 17036 1002 Lag Screw 5 16 x 2 1 2 3 14161 400 Access Ladder Bracket 112 17138 1025 T25 Deck Screw 10 x 2 1 2 18 17020 109 Screw Phillips 8 x 2 1 2 8mm Flat Washer 1 4 Lock Washer 1 4 X 1 1 2 Hex Bolt 1 4 Weld ...

Отзывы: