Step 18 — Prepare Swing Attachments:
depending on the swing frame option to be installed, different preparations must be made before proceeding.
9 foot Swing beam:
for a
9 ft. beam fastened perpendicular to the roof
, drill
two 7/16" diameter holes as shown above left. insert 3/8"
Weld nuts from the beam hardware bag before moving to
the step 20.
4-1/8"
4-1/8"
Align to top hole
8"
8"
4"
9 ft. Beam Parallel to Roof
9 ft. Beam Perpendicular to Roof
for a
9 ft. beam fastened parallel to the roof
, drill three
holes as shown above right. The top hole should be 3/8"
diameter, the bottom two 7/16" diameter. insert a 5/16"
Weld nut into the top hole and 3/8" Weld nuts from the
beam hardware bag in the bottom holes before moving to
the step 20.
4-1/8"
8"
7 ft. Beam Parallel to Roof
for a
7 ft. beam fastened parallel to the roof
, drill three
holes as shown above right. The top hole should be 3/8"
diameter, the bottom two 7/16" diameter. insert a 5/16"
Weld nut into the top hole and 3/8" Weld nuts from the
beam hardware bag in the bottom holes before moving to
the step 20.
7 foot Swing beam:
27-1/2" to top of post
for a
7 ft. beam fastened perpendicular to the roof
,
mount the Swing Beam to the back of the center of the gym
using a Swing mount (d). See the panel entitled Back Side
Swing mounts on the next page for mounting details.