background image

Ridgefield

19803-100 Rev g (10-17)

© Copyright 2011, Creative Playthings

Page 23

ASSeMbly inSTRuCTionS

K

AQ

Step 37 — Window guard:

The  Window  guard  is  only  needed  when  a  Swing  Beam 

is mounted from the back of the Clubhouse using a swing 

mount. on the side of the gym where swing mount is posi-

tioned, the window opening and adjacent Wall Support cre-

ate an opening for a child's body to pass through, but with 

no room for his head. A dangerous head entrapment could 

result.
fasten a Window guard (AQ) to the outside of each lower 

window  opening  using  four  #8  x  1-5/8"  Screws.  leave  no 

gap greater than 3-1/2".

Step 38 — Slide Mount:

Place  the  Slide  mount  tight  against  the  Platform  Support, 

centered on the opening left for the slide. The beveled edge 

of the Slide mount should face the inside of the gym. Se-

cure the Slide mount to the Platform Boards using four #10 

x 2-1/2" Screws.
drive the screws until the heads are flush with the top of the 

Slide mount. do not over-tighten; over-tightening may cause 

the points of the screws to protrude through the bottom of 

the Platform Boards.

Step 39 — Slide:

Position the Slide on the Slide mount through the opening 

prepared  in  earlier  steps.  Center  the  Slide  in  the  opening 

and pull it tight to the platform until it stops against the edge 

of the Platform Support. make sure and that the holes in the 

Slide are over the Slide mount.
Check that the Slide extends out perpendicular from the play 

set.
drill 5/16" holes through the Slide, Slide mount and Platform 

Boards using the holes in the Slide as a guide. fasten the 

slide using one 1/4 x 3" Truss Head Bolt and one 1/4" Weld 

nut for each hole.
note:  in  some  positions,  a  Stringer  may  be  encountered 

when drilling. Stop drilling, remove the Platform Board and 

insert the Weld nut into the hole from below. Reinstall the 

Platform Board and continue with assembly. it may help to 

clear space for the Weld nut but using a 1" paddle bit on the 

underside of the Platform Board

Содержание Ridgefield

Страница 1: ...use only and not intended for use in any public setting Placement in any public setting constitutes a misuse of this product Creative Playthings takes great care to design its products with your chil...

Страница 2: ...l devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow more than...

Страница 3: ...loping ground can cause it to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free...

Страница 4: ...ex Bolt 1 4 x 1 4 17119 1209 Truss Head Bolt 1 4 x 3 1 50334 702 5 16 Weld Nut Bag 66 17001 105 Weld Nut 5 16 1 50334 103 5 16 Washer Bag 66 12017 206 Lock Washer 5 16 84 12002 206 Flat Washer 5 16 1...

Страница 5: ...ith the surface of the wood and there are no protruding sharp edges Assembly Layout Align the holes in the parts to be fastened Start prelimi nary tightening of bolt into weld nut by hand Tighten each...

Страница 6: ...2 x 4 x 59 1 4 B 8 31682 102 Angle Brace 2 x 4 x 17 1 4 C 1 31765 102 Ladder Slat 5 4 x 3 x 19 F 4 32405 102 Corner Post 4 x 4 x 116 G 2 32420 102 Inside Stringer 2 x 3 x 59 1 4 H 2 32421 102 Outside...

Страница 7: ...2419 102 End Wall Support 2 x 6 x 59 1 4 X 1 32843 402 Ridge Cap Part A 5 4 x 3 5 32 x 59 1 4 Y 1 32844 402 Ridge Cap Part B 5 4 x 2 9 32 x 59 1 4 Z 1 40422 102 Access Ladder Assembly AA 2 33445 102 P...

Страница 8: ...last for years with proper maintenance Maintenance of the play set finish will vary depending on weather climate As a safety precaution check all hardware for tightness twice a month during use and at...

Страница 9: ...e A Hex Bolt Assem bly consists of one Hex Bolt one Lock Washer one Flat Washer and one Weld Nut F F AU K K K K Q Q Q The Ridgefield gym is built using the frame of the Williamsburg gym as a base stru...

Страница 10: ...the bottom of the board Fasten each Sandbox End to the Sandbox Center using four 5 16 x 3 Lag Screws with four 5 16 Flat Washers Pass each Lag Screw through a Flat Washer then through a hole in the Sa...

Страница 11: ...K at right With a 7 16 diameter drill bore the holes indicated in the appropriate Posts Before installing the Center Platform Support insert a 5 16 Weld nut into the hole directly below the hole just...

Страница 12: ...the lower hole in the Platform Front or Back the Post and then the end of the Porch End Stringers Note the hole should be slightly offset toward the top of the board Fasten the opposite end of each En...

Страница 13: ...1 2 Hex Bolt Assemblies Start from the outside of the Gym Push each bolt through the bottom hole in the Left Platform Side and the Posts be fore passing through the Outside Stringer On the center Post...

Страница 14: ...n The edge of the boards should align with the corner of the adjacent Posts Fasten the Narrow Platform Boards to the Stringers with eight 8 x 2 Flat Head Wood Screws for each board Locate one 52 3 4 N...

Страница 15: ...f the main tower as shown Space the Platform Boards evenly Attach each Platform Board using eight 8 x 2 Flat Head Wood Screws Step 16 Porch End Wall Supports Fasten the Porch End Wall Supports AB to t...

Страница 16: ...s shown above right The top hole should be 3 8 diameter the bottom two 7 16 diameter Insert a 5 16 Weld Nut into the top hole and 3 8 Weld Nuts from the beam hardware bag in the bottom holes before mo...

Страница 17: ...diameter hole posi tioned 3 1 2 left of the very center of the Side Wall Sup port P Fasten one Swing Mount D to the Side Wall Support using one 5 16 x 4 Hex Bolt Assembly Plumb the Swing Mount Mark th...

Страница 18: ...s to the Platform Supports Fasten the Panel to the Corner Posts using three 5 16 x 2 1 2 Lag Screws and Flat Washers as shown Bore pilot holes using a 1 4 diameter drill into the Corner Posts prior to...

Страница 19: ...ameter pilot holes through the top board of each roof panel The pilot holes should be at least 3 from the end of the roof board and approximately 3 4 from the top edge Space the pilot holes every 10...

Страница 20: ...way that the gap between the boards looks the same as the gap between the boards on the End Panel Fasten using 8 x 1 5 8 Screws Repeat with the Panel at the other end of the gym AH View from inside g...

Страница 21: ...Drill 1 4 diameter pilot holes 24 up from the bottom of the Posts where the Safety Rail is to be mounted Fasten the Safety Rail using 5 16 x 3 Lag Screws with 5 16 Flat Washers as shown Step 33 Wall...

Страница 22: ...ess Ladder Brackets against the Platform Sup port as shown Mark and drill 3 8 diameter holes through the Platform Support Fasten each Access Ladder Bracket to the Platform Support using one 5 16 x 1 1...

Страница 23: ...e the screws until the heads are flush with the top of the Slide Mount Do not over tighten over tightening may cause the points of the screws to protrude through the bottom of the Platform Boards Step...

Страница 24: ...The warranty can be found in your Owner s Manual Please fill out the warranty card on the back of your owners manual Your completed warranty card will allow us to quickly process warranty claims Thank...

Отзывы: