9
Remove Parts Box from Basin, Attach Rope to Pumps,
Record Pump Data
STEPS & TIPS:
Remove Parts Box. It should contain the
following items: Lifting device, Discharge
Piping, Stand, Level Control Mounting &
Cord, Check Valve, Misc. Hardware
• Record pump information on user guide
for future reference.
• Attach lifting device to pump.
1. Make a small overhand loop in the
rope.
2. Bring the short end through the overhand
loop.
3. Place short end behind the fixed part of
the rope.
4. Bring end around and back into the
loop.
5. Pull on the fixed end of the rope away
from the loop to tighten the knot.
• NEVER LOWER OR RAISE PUMP BY THE
CORD!
• Secure pump base and level control with
hardware provided.
• Assemble pipe and check valve to pump.
FIGURE 3
Содержание BARNES PRESSURE SYSTEMS omni GRIND plus ULTRA GRIND OGP2022AUE Series
Страница 12: ...12 Typical Wiring Diagram Generic ...
Страница 15: ...15 FIGURE 8 2000 SERIES STATION WIRING WIRING FOR UNITS NOT SUPPLIED WITH FACTORY WIRED EQD ...
Страница 16: ...16 FIGURE 9 PARTS LIST OGP2022AUE ...
Страница 20: ...Notes ...