page 5
5. Fan Assembly.
diagram 2
diagram 1
diagram 4
downrod
electrical wiring
yoke set screw
and nut
pin
clip
set screw
hanging ball
stop pin
pin
clip
set screw hole
hanging ball
stop pin
diagram 3
canopy
motor
housing
downrod
Remove hanging ball from downrod provided
by loosening set screw on hanging ball.
Remove pin and clip. Lower hanging ball and
remove stop pin. Then slide hanging ball off
downrod. [
Refer to
diagram 1
.
]
Loosen yoke set screws and nuts at top of
motor housing.
[
Refer to
diagram 2
.
]
Tip
: To prepare for threading electrical wires
through downrod, apply a small piece of
electrical tape to the ends of the electrical
wires--this will keep the wires together when
threading them through the downrod. [
Refer to
diagram 2
.
]
Determine the length of downrod you wish to
use.Thread electrical wires through threaded
end of downrod and pull extra wire slack from
the upper end of the downrod. [
Refer to
diagram 2
.
]
Thread downrod into the motor housing yoke
until holes for pin and clip in downrod align
with holes in yoke--
make sure wires do not get
twisted
. Re-insert pin and clip that were
previously removed. Tighten yoke set screws
and nuts securely. [
Refer to
diagram 2
.
]
Locate canopy cover in hardware pack. Slide
canopy cover and canopy over downrod. [
Refer
to
diagram 3
.
] (
Note
: Canopy cover must be
turned with shiny side
toward
the motor
housing.)
Thread wires through hanging ball and then
slide hanging ball over downrod--the top of
the downrod should be noted as having a set
screw hole; use this hole when setting the set
screw. Insert stop pin into top of downrod and
raise hanging ball. Be sure stop pin aligns with
slots on the inside of the hanging ball. Tighten
set screw securely. [
Refer to
diagram 4
.
]
WARNING
: Failure to tighten set screw (on
hanging ball) completely could result in the fan
becoming loose and possibly falling.
["Fan Assembly" continued on next page.]
canopy cover