E-Z 50 Melter Part Manual
Operating Instructions
Chapter 5
©2017 by Crafco, Inc. All Rights Reserved…………………..…………………………………………Operating Instructions 5-2
5.3
Starting the Burner
Table 5-2 Starting the Burner
Step
Action
1
Open LPG tank valve. See
Figure 5.6
2
Open in-line ball valve. See
Figure 5.6
3
Open propane burner access door. See
Figure 5.5
4
Open burner control box
5
Turn temperature control “OFF”
6
Turn pilot control to pilot. See
Figure 5.4
7
Push pilot control in and light pilot light using supplied torch. Pilot light is
located inside propane burner access door. Hold pilot control until pilot
remains lit when control knob is released. After pilot is burning, turn pilot
control knob to “ON”. See
Figure 5.7
8
Turn temperature dial to desired setting. Burner should ignite.
9
Close access door
Important:
The solid material in the tank melts first around the walls and
bottom of the tank. The material temperature sensor is located by the wall,
therefore, it is possible that at the beginning of the melt process the indicated
temperature reaches operating value, but the material closer to the center of
the tank is still solid. This is normal.
10
Allow the heat transfer oil to continue to heat.
11
When the sealant material reaches 275°F, engage the mixer. If the mixer
does not move, allow the material to heat longer.
12
Caution
Jamming the mixer can cause the hydraulic oil to overheat and damage the
machine
Figure 5.6
Figure 5.5
Figure 5.4
Figure 5.7
Содержание E-Z 50
Страница 1: ...Parts Manual 26211 Revision C Melter Applicator...
Страница 3: ......
Страница 6: ......
Страница 8: ......
Страница 12: ......
Страница 16: ......
Страница 37: ...2017 Crafco Inc...