Electrofusion Welder
26/07/2011
www.LaboratoryDrainage.co.uk
Pg 25
STEP 5
Pipe Insertion
– insert pipe into the joint assembly, until depth mark
disappears and the pipe
‘bottoms
out’.
STEP 6
Tighten Locking Nut
- use the CPV-Zurn spanner and/or strap wrenches.
The depth mark should be just visible.
THE PIPES SHOULD BE A SNUG FIT Do not proceed if they are loose
Straighten up the Fusion Seal Terminals
IMPORTANT CHECK (BEFORE FUSION): Where necessary, support
horizontal runs to prevent sagging and clamp vertical runs to prevent
joint movement
Содержание Zurn
Страница 1: ...Electrofusion Welder ...
Страница 28: ......