82
board. The control board DSP is responsible for disconnecting the
inverter from the grid after receiving the Arc protection signal to ensure
safety. The Arc board failure will cause
‘arc board err’ shown on the
LCD and it will not connect to the grid until the arc board is OK. If there
is an Arc fault, the LCD displays the fault which can only be cleared
manually.
4. ARC Clear
. Mannually clear the ARC fault. Move the cursor to this
menu, and press ENT. The operation result will appear on the LCD, ie.
“Succeed” or “Failed”. Complete this action after checking the PV
system for potential arcs and taking corrective action.
5. MPPT Scan.
Mannually execute the MPPT scan. Move the cursor to
this item and press the ENT key to initiate the scanning. The LCD
screen will skip to normal operation interface if the MPPT scanning
succeeds or remain on the MPPT Scan menu interface if the scanning
fails.
The factory default setting for "MPPTScan" is set to Enabled, yet can
also be set to Disabled. When the MPPT scan function is enabled, the
default scan period is every 60 minutes. The inverter will scan the
maximum power point in the MPPT range, according to the following
condition:
While in Parallel mode, the total input power is lower than 90% of the
active power.
While in Independent mode (3 MPPTs), the input power must be lower
than 75% of the rated power for each MPPT tracker.
Once this MPPT scan function is activated on LCD, it will search the
maximum power point at a voltage step of 5V in the MPPT range for
full load and retrieve the maximum power point.
Содержание SCA Series
Страница 2: ......
Страница 35: ...27 ...
Страница 39: ...31 Figure 3 9 Mount the Main Enclosure on the Bracket by Lifting Sling Figure 3 10 Grab Handle Position ...
Страница 91: ...83 ...
Страница 146: ...138 1 5 Figure 8 1 Replacing Cooling Fans 2 3 ...