![CPS FA1000 SERIES Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/cps/fa1000-series/fa1000-series_operation-manual_2675201014.webp)
TIME REMAIN-
ING
00:00:00
QUIT >
EVACUATION IN PROGRESS
Once
DRAINING OIL
is complete, the unit will pro-
ceed to
Evacuation
. The vacuum pump will run
until the
TIME REMAINING
reaches
00:00
.
The LCD will now read:
TIME REMAINING
00:02:00
PLEASE WAIT
SKIP >
LEAK CHECK IN PROGRESS
The unit will proceed to a 2:00 minute leak check test.
The LCD will now read:
Note: If leak check fails, check A/C system for leaks.
The FULL CYCLE process will be aborted.
IF REQUIRED
INJECT OIL AT
THIS TIME
CONTINUE >
QUIT >
Once the
LEAK CHECK
has passed or the
SKIP
key is pushed,
The LCD will read:
For model FA1000/FA1000B, use the 481500 Oil/Dye injector kit
to inject oil into the mobile A/C system. For all other models, use
the integrated oil injection bottle to add oil into the mbobile A/C
system.
CHARGING
CHARGE SELCTED
2.00 LBS
CHARGE DISPENSED
0.00 LBS
QUIT >
The LCD will now read:
The
CHARGE DISPENSED
reading will begin to increase.
Note: If the unit does not completely dispense the charge
into the A/C system, the LCD will notify the user of
options to complete the charge.
OPERATING INSTRUCTIONS FOR THE FA1000
14
Once the CHARGE DISPENSED equals the CHARGE.
The LCD will read: Close HIGH SIDE COUPLER.
Push
CONTINUE
key.
CLOSE HIGH SIDE COUPLER
CONTINUE >
Содержание FA1000 SERIES
Страница 24: ...www cpsproducts com 73 088 REV B ...