COSTAN TECHNICAL DOCUMENTATION
REVISION STATUS
TRUE COPY
PAGE 8 OF 5
PRODUCT:
EPTAGLOO
ORD
DATE
CHANGE ORDER
OF THE SIGNED
DATE OF 1st ISSUE
A
18.Dec.2008
DOCUMENT
EXTENSION
ORIGINAL
13/June/07
DOC. no. QSM0000406A
CHAP. No.:
030
B
28.July.2009
ENTERING
OF.
NC
CHAPTER:
HANDLING AND POSITIONING
C
23.Feb.2010
RANGE EXTENSION
ISSUED BY MKT
FIG.2
If the equipment is lifted by the use of a crane it is possible
to proceed as indicated in FIG.3.
Fit the two steel bars with the lifting slings at the ends
through the vibration damping supports (ensure that the
slings meet the lifting capacity needed). Place spacers, e.g.
wood spacers between the slings and the equipment in order
to avoid friction between the slings and the equipment's
paneling.
FIG.3
!
Ensure that nobody is in the handling area during the hoisting procedures.
Содержание EPTAGLOO
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......