27 of 64
CORRADI S.R.L.
- INSTALLATION MANUAL - PERGOTENDA ® MAESTRO
REV.1 - 11.2019
5 CENTRAL RUNNER INSTALLATION OF A THREE-RUNNER STRUCTURE
Fig. 31
- Motor “
Y
” is already installed on the side of the beam (see page 24);
- fit the central runner (
A
) in the lower screw (
B
) on the crossbeam, then tighten the upper screw (
C
).
AFTER INSTALLING THE MOTOR SHAFTS,
fit the RH-LH casings (
D
) and fix them with the relevant self-drilling screws.
AFTER INSTALLING THE MOTOR SHAFTS,
fit the central casing (
D
) and fix it with the relevant self-drilling screws.
A
B
C
E
D
Y