![Cornelius FCB Pinnacle 2 Flavor Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/cornelius/fcb-pinnacle-2-flavor/fcb-pinnacle-2-flavor_installation-manual_2668289015.webp)
FCB Pinnacle 2 and 4 Flavor Installation Manual
© 2003-2014, Cornelius Inc.
- 13 -
Publication Number: 560007295INS
Cart Mount
1.
Attach the Over Flow Drain Tube to the Frame and Cart, as shown, with two (2) nylon clamps and
two (2) 1/2” 8-32 screws.
Figure 16.
2.
Attach the 2 Brackets to the Frame using two (2) 1/2” 8-32 screws for each.
Figure 17.
3.
Slide the Drip Tray on to the Brackets (allowing the catch bullets on the Drip Tray Brackets to interface with
the detents on the Drip Tray Frame).
4.
Add the 2 Spacers to the rear side of the Splash Panel before attaching it to the frame (Figure 14.)
5.
Secure the Splash Panel to the Frame using four (4) 1-1/4” 8-32 screws.
Figure 18.
Over
Flow
Drain
Tube
Screws
Cable
Tie
with
Eyelet
Fixed
Diameter
Clamp
Mounted
to
Cart
Brackets
Содержание FCB Pinnacle 2 Flavor
Страница 22: ...FCB Pinnacle 2 and 4 Flavor Installation Manual Publication Number 560007295INS 20 2003 2014 Cornelius Inc...
Страница 23: ......
Страница 24: ...Cornelius Inc www cornelius com...