Cooper F6-PA-LS Скачать руководство пользователя страница 32

Using Removable Inserts

The front panel inserts can be changed, if desired.
 

1.

 De-energize both AC and DC power.

 

2.

 Use a flathead or 3/33" hex key screwdriver to unscrew 

the six front panel screws.

 

3.

 Pull the right side of the front panel out towards the left 

(Figure 22).

Note:

  Various connecting wires will keep the panel attached 

to the control.

Note:

  It is not necessary to disconnect any wires.

 

4.

 Use tweezers to gently pull out the removable insert.

Note:

  The insert will slide out of the right side of the 

operating panel (Figure 23).

Note:

  The insert will slide out of the top of the programming 

panel indicator section (Figure 22).

 

5.

 Change the existing label or slide in a new label with the 

name of the programmed option.

   An electronic label template is included on the ProView 

application software CD and can be accessed through 

the following default address:

   C: \ Program Files \ Cooper \ ProviewXX \ Form 6 \ 

Form 6 Inserts.doc

 

6.

 Gently push the removable insert from right to left into 

the right side of the operating panel (Figure 23) or down 

into the programming panel LED indicator section 

(Figure 22).

 

7.

 Place the front cover panel back onto the control. 

Using a flathead screwdriver screw the screws into the 

control and tighten all hardware completely.

Form 6-LS Pole Mount Recloser Control Installation and Operation Instructions

32

CAUTION: 

Equipment damage. Always wear a 

grounding wrist strap to control static electricity before 

handling circuit boards. Failure to use this strap may 

result in circuit board damage. 

T253.1

CAUTION: 

Control damage. De-energize both AC and 

DC power prior to removing or installing any internal 

connections or circuit boards in the control. Failure to 

comply can result in damage to the control. 

T241.1

Figure 23.

Labels are easily removed from and inserted into the 

operating panel.

Figure 22.

Open front panel. Labels are easily removed from and 

inserted into the top of the programming panel LED 

status indicator section.

IMPORTANT: 

Laminate the removable inserts prior to 

installing. This will seal the ink/toner and avoid damage 

to the front panel.

Removable LED 

Status Indicator Panel

Содержание F6-PA-LS

Страница 1: ...g Removable Inserts 32 Accessories 33 Loop Sectionalizing Accessories 33 120 VAC GFI Duplex Outlet 33 Discrete Interface Board Option Accessory 33 Cabinet Ordering Accessories 33 Cable Locking Sleeves...

Страница 2: ...d high voltage lines and equipment and support our Safety For Life mission This manual may contain four types of hazard statements DANGER Indicates an imminently hazardous situation which if not avoid...

Страница 3: ...rol Refer to the Customer Connections for AC Power section in this manual Control Battery Storage and Charging The 24 VDC control battery in the Form 6 recloser control is fully charged prior to shipm...

Страница 4: ...itive ground fault and sync check The control is for application in distribution feeder loop sectionalizing schemes The Form 6 LS control senses the loss of voltage and after a predetermined time dela...

Страница 5: ...ence of reclose commands and locks out with the recloser open Once locked out the control must be closed via the operator panel or SCADA communications This resets the control to the start of the oper...

Страница 6: ...roView 5 X X Form 6 Control Programming Guide for information on programming the text messages These text messages appear on the front panel LCD and can be programmed to appear for alarm or other cond...

Страница 7: ...recloser alarms CHANGE Allows the user to change the state of the con trol functions on the operator panel function keys Note The CHANGE mode is a ten second period in which one function setting can...

Страница 8: ...AC or battery power CONTROL LOCKOUT The green LED indicates the control is in a locked out state i e a reclosing sequence is not in progress This LED does not indicate that the recloser is open RECLO...

Страница 9: ...not restored before the Voltage Transfer time delay relay elapses the LEDs remain off even if voltage returns to a particular phase This identifies the phase that caused the LS to operate Activating...

Страница 10: ...nd holding the CLOSE pushbutton does not activate the Cold Load Pickup feature See Cold Load Pickup in the Control Features section of this manual CLOSE CIRCUIT DISABLE Close Circuit Disable Figure 7...

Страница 11: ...g the SUPERVISORY OFF key Operational data and metering information are available while the control is in the SUPERVISORY OFF position The TRIP and CLOSE pushbuttons and Hot Line Tag are active indepe...

Страница 12: ...control to step through selected operations in the operating sequence without tripping The number of Sequence Coordination advances is programmable from one to three operations to provide trip coordi...

Страница 13: ...also provides a minimum of three configurable input control contacts Each control contact is configurable using a graphical interface software Contacts accept a whetting voltage range of 12 250 VDC 1...

Страница 14: ...ys of information the data profiler can provide depends upon configuration parameters Refer to Service Information S280 70 4 ProView 4 X X or S280 70 21 ProView 5 X X Form 6 Control Programming Guide...

Страница 15: ...nterface software protocol The user can simultaneously communicate to the Form 6 control using both the front panel data port and the appro priate back panel serial communication port provided the bac...

Страница 16: ...s Form 2 Form 3 Form 3A Form 4A Form 4C FXA FXB Form 5 and Form 6 recloser controls and are identified with the following label prominently displayed on the recloser sleet hood or the front of the ope...

Страница 17: ...VSO16 16 000 1608 Auxiliary Powered NOVA 12 500 1111 Control Powered NOVA 12 500 1111 Duty Cycle Factor is Value x 105 WARNING Hazardous voltage Recloser and control must be solidly grounded Follow al...

Страница 18: ...y voltage transformer Figure 12 illustrates grounding methods for 4 wire multi grounded systems with remote supply voltage transformer For effective surge protection all control and power conductors f...

Страница 19: ...ISABLED A PHASE VOLTAGE B PHASE VOLTAGE C PHASE VOLTAGE FREQUENCY TRIP VOLTAGE TRIP METERING RESET TARGETS EVENTS LAMP TEST MENU ENTER SETTINGS OPER COUNTER ALARMS CHANGE F1 F2 F3 F4 TRIP CLOSE HOT LI...

Страница 20: ...L CONNECTIONS Line to Neutral connected transformer Input Terminal Block External Ground Lug Figure 11 Recommended grounding method for the Form 6 LS pole mount recloser control installed on 4 wire mu...

Страница 21: ...l Ground Lug Note Distance between transformer and recloser should be one pole span or less System Neutral Figure 12 Recommended grounding method for the Form 6 LS recloser control installed on 4 wire...

Страница 22: ...or load side of the recloser The relay transfers the control power source from Source I of the control to Source II load side upon loss of source side voltage This circuitry is rated for 120 VAC oper...

Страница 23: ...120 L2 TRANSFER RELAY COIL Power to Control Heater Convenience Outlet Transfer Relay shown de energized Y 15 Amp fuse 15 Amp fuse Figure 14 Default factory wiring transfer relay connections connected...

Страница 24: ...ction WARNING Hazardous voltage Before applying power to the control confirm that male pins of the input power receptacle are electrically insulated to prevent unintentional contact with 120V AC volta...

Страница 25: ...ns of the input power receptacle are electrically insulated to prevent unintentional contact with 120V AC voltage Failure to do so may result in severe personal injury or death T372 0 DANGER Hazardous...

Страница 26: ...p Time 8 ms Dropout 15 ms Contact Input Voltage Rating 120 VAC 8 A 12 VDC 8 A 24 VDC 8 A 48 VDC 8 A 125 VDC 8 A Table 6 Ratings Table for Output Status Contact SS1 Resistive Load Pickup Time 2 ms Drop...

Страница 27: ...te Contact output relays revert to de energized positions as shown upon downloading new schemes or Workbench files Relay Contacts shown for Indicated Status Figure 17 Form 6 LS control standard defaul...

Страница 28: ...rmal Alternate Profile 3 Status Not in Alt 3 Profile Voltage Alarm Voltage Normal Relay Contacts shown for Indicated Status Customer Wiring Remote Supervisory Common Customer Supplied Voltage Inputs W...

Страница 29: ...position Factory Supplied 28 VDC Whetting Voltage A Single common wire can be used for multiple inputs if it is jumpered at the I O board terminals NOTES Arresters to be metal oxide varistors MOVs 320...

Страница 30: ...anel RS 232 Communication Port Pin Assignments RS 232 DTE J1 RS 232 1 2 3 4 5 6 7 8 9 Figure 21 Rear panel RS 232 communication port pin identification TB1 1 2 3 5 7 9 11 13 15 17 19 4 6 8 10 12 14 16...

Страница 31: ...ser Control Programming Guide for additional information 11 Control clock set to the correct time Note Refer to Service Information S280 70 4 ProView 4 X X or S280 70 21 ProView 5 X X Form 6 Microproc...

Страница 32: ...m right to left into the right side of the operating panel Figure 23 or down into the programming panel LED indicator section Figure 22 7 Place the front cover panel back onto the control Using a flat...

Страница 33: ...ow Voltage Closing Reclosers 120 VAC Single or Three Phase Sensing Junction box equipped with Source 1 and Source 2 sensing cables 4 conductor 5 ft length includes hardwiring the low voltage closing c...

Страница 34: ...r Systems representative for any additional voltage requirements Form 6 LS Pole Mount Recloser Control Installation and Operation Instructions 34 Radio Mounting Bracket 24 Vdc to 13 8 Vdc Converter Cu...

Страница 35: ...n required This converter is compatible with loop ring and point to point star configurations A pair of industry standard ST type fiber optic connectors are mounted on the back of the board enabling c...

Страница 36: ...Figure 27 2 Check the operational values for currents voltages and other metering information Note Scroll through the LCD display messages by press ing the and cursor movement arrows under neath the...

Страница 37: ...ports and IRIG B timing con nections Figure 29 7 Disconnect the ground from the control 8 Carefully transport the control to a suitable service facility S280 70 10 37 CONTROL POWER CONTROL OK CONTROL...

Страница 38: ...r testing the following functions of the Form 6 recloser control Overcurrent Timing Reclose Time Operating Sequence Reset Time Minimum Trip Current High Current Trip and Lockout The MET Tester is comp...

Страница 39: ...nly high enough to force the required current through the secondary of the transformer and the recloser Note An alternative method of providing the necessary current through the transformer is shown i...

Страница 40: ...ructions 40 WARNING Hazardous voltage Solidly ground all equipment Failure to comply can result in death severe personal injury and equipment damage T223 2 3 6 4 T3 Y H X Z VOLTAGE RATING OF RECLOSER...

Страница 41: ...operating the manual closing tool 6 Replace the gasket and port cover on the recloser head after testing has been completed S280 70 10 41 Figure 35 Suggested test circuit for motor operated solenoid...

Страница 42: ...menu Note Voltage should be between 25 31 VDC with the higher voltage at colder temperatures Under normal conditions with AC connected and a fully charged battery the charging current should be less t...

Страница 43: ...2 27 volts per cell then the charge rate reduces to maintain a trickle charge The yellow LED flickers to indicate the battery has reached a full charge This process can take up to 24 hours Refer to T...

Страница 44: ...r after ten seconds the control returns to normal operation 8 Verify the control clock is set to the current time after AC power has been reapplied Note The control clock may require resetting if the...

Страница 45: ...Equipment Misoperation The control powered NOVA reclosers that require a VTC interface must be used with VTC ready controls Failure to use a VTC ready control will result in failure to trip or close...

Страница 46: ...uire a VTC interface Catalog numbers for these kits are listed in Table 15 To order these kits or to obtain information on how to make a Form 4C recloser VTC ready contact your Cooper Power Systems re...

Страница 47: ...ctory service department offers a basic testing and troubleshooting course for the Form 6 microprocessor based electronic recloser control This course taught by experienced service technicians is held...

Страница 48: ...ditor are trade marks of Cooper Industries in the U S and other countries You are not permitted to use Cooper trademarks without the prior written consent of Cooper Industries IEEE is a registered tra...

Отзывы: