Revised: 01/09/2016 13/02/17
12
heater goes to high. If you wish to go to low, press bottom button. If the heater does not
stay alight, switch off, by top button and start again. This may have to be done 2 – 3
times, until unit is purged.
8.
Once heater is working, unpack log set and place in firebox, making sure you do not
move the sensor or sparker when placing the logs.
9.
Re-assemble heater in reverse order. Make sure the clips are fastened correctly at the rear
of the Free Standing model. Make sure that the door on the Freestanding/Inbuilt model
are sitting on 2 pins located at the front of the fire box.
INSTRUCT CUSTOMER OF CORRECT OPERATING PROCEDURE
DOOR ASSEMBLY
1.
SIT THE DOOR ON THE 2 PINS LOCATED AT THE
FRONT OF THE FIREBOX, MAKING SURE THE DOOR IS
PERFECTLY SQUARE.
2.
SIMULTANEOUSLY CLIP THE BOTTOM LEFT AND
RIGHT CLIPS CLOSED.
3.
REPEAT THE SAME ACTION ON THE TOP 2 CLIPS.
THIS WILL ENSURE THAT NO EXTRA TENSION IS PUT
ON OTHER SIDE
Содержание grange
Страница 15: ...Revised 01 09 2016 13 02 17 15 6mm Cement Sheeting required for floor installation ...
Страница 19: ...Revised 01 09 2016 13 02 17 19 INTERNAL WALL UNDER FLOOR INSTALL WITH HORIZONTAL FLUE ...
Страница 21: ...Revised 01 09 2016 13 02 17 21 DIMENSIONS OF APPLIANCE INBUILT MODEL ...
Страница 23: ...Revised 01 09 2016 13 02 17 23 FREESTANDING MODEL Overall height on the freestanding model is 770mm ...
Страница 25: ...Revised 01 09 2016 13 02 17 25 WIRING DIAGRAM PRESSURE SWITCH ...
Страница 32: ...Revised 01 09 2016 13 02 17 32 ...