This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer
’s instructions may invalidate the warranty but does not affect statutory rights.
Customer name:
Telephone number:
Address:
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (PRINT NAME):
Certified Operative Reg. No. [1]
Company name:
Telephone number:
Company address:
Commissioning date:
Building Regulations Notification Number (if applicable) [2]
CONTROLS - SYSTEM AND HEAT PUMP
(tick the appropriate boxes)
Room thermostat and programmer/timer
Time and temperature control to heating
Load/weather compensation
Programmable Roomstat
Optimum start control
Time and temperature control to hot water
Cylinder thermostat and programmer/timer
Combined with Heat pump main controls
Heating zone valves (including underfloor loops)
Fitted
Not required
Hot water zone valves
Fitted
Not required
Thermostatic radiator valves
Fitted
Not required
Heat Pump Safety Interlock [3]
Built In
Provided
Outdoor Sensor
Fitted
Not required
Automatic bypass to system
Fitted
Not required
Buffer Vessel Fitted
Yes
No
If YES
Volume:
Litres
ALL SYSTEMS
The heating system has been filled and pressure tested
Yes
Expansion vessel for heating is sized, fitted & charged in accordance with manufacturer
’s instructions
Yes
The heat pump is fitted on a solid/stable surface capable of taking its weight
Yes
The system has been flushed and cleaned in accordance with BS7593 and heat pump manufacturer
’s instructions
Yes
What system cleaner was used?
What inhibitor was used?
Quantity
litres
Is the system adequately frost protected?
Yes
OUTDOOR UNIT
Are all external pipeworks insulated?
Yes
Is the fan free from obstacles and operational?
Yes
Has suitable consideration been made for waste water discharge?
Yes
CENTRAL HEATING MODE
Heating Flow Temperature
°C
Heating Return Temperature
°C
DOMESTIC HOT WATER MODE
Measure and Record:
Is the heat pump connected to a hot water cylinder?
Unvented
Vented
Thermal Store
Not Connected
Hot water has been checked at all outlets
Yes
Have Thermostatic Blending Valves been fitted?
Yes
Not required
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected:
Gas Boiler
Oil Boiler
Electric Heater
Solar Thermal
Other:
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations
Yes
All electrical work complies with the appropriate Regulations
Yes
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer
’s instructions
Yes
The operation of the heat pump and system controls have been demonstrated to the customer
Yes
The manufacturer
’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer
’s Signature
Customer
’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer
’s literature)
Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and
Wales must be notified to Local Area Building Control (LABC) either directly or through a Competent Persons Scheme. A
Building Regulations Compliance Certificate will then be issued to the customer. [3] May be required for systems covered
by G3 Regulations
© Heating and Hot Water Industry Council (HHIC)
Содержание inverTech CE-iVT18
Страница 10: ...Page 10 Cool Energy inverTech Manual v6 6 2020 Example Installation Method 2 Heating only with radiators ...
Страница 12: ...Page 12 Cool Energy inverTech Manual v6 6 2020 Example Installation Method 4 Hot Water Thermal Store Only ...
Страница 13: ...Page 13 Cool Energy inverTech Manual v6 6 2020 Example Installation Method 5 Hot Water Heating ...
Страница 16: ...Page 16 Cool Energy inverTech Manual v6 6 2020 Wiring Diagrams Single Phase inverTech Models ...
Страница 17: ...Page 17 Cool Energy inverTech Manual v6 6 2020 3 Phase inverTech Models ...
Страница 37: ...www coolenergyshop com www heatingshop ie ...