01.2016
4-9
Operator’s Manual: Commercial Seed Tender (CST-34 Series)
4.3.4 Conveyor Belt Replacement:
The Slave Conveyor’s belt must be replaced by
accessing the belt at the tail end.
The Folding Conveyor’s belt can be accessed by
removing the lower guard. Straighten the Folding
Conveyor and lower it, so the belt can be accessed
throughout it’s length.
1. Loosen, and move the tail roller bearing assembly
into its loosest position.
2. Open the conveyor belt by removing the
connecting rod in the lacing.
3. Attach the replacement belt to the end of the old
belt.
4. Slowly pull the old belt out of the machine.
The new one will thread into position.
5. Disconnect the old belt.
6. Connect the ends of the new one together.
7. Work a new rod into the lacing. Crimp the end.
8. Move the rollers into position.
9. Set the tension of the belt and secure the bearing
assemblies.
10. Check the tension and alignment of the conveyor
belt frequently during the first 10 hours of
operation.
Adjust as required.
Then, go to the regular service schedule.
Note:
Normally, a conveyor belt will seat itself during the
first 10 hours of operation, then requires little to
no adjustment.
Fig 43 - Alligator Belt Lacing
Fig 44 - Belt Guard
Fig 45 - Threading the Belt
Pull until old belt can be removed
Connect old belt to the new
Содержание CST-1634
Страница 1: ...COMMERCIAL SEED TENDER Models CST 1634 CST 1834 CST 2034 CST 2434 OPERATOR S MANUAL ...
Страница 4: ......
Страница 8: ...Operator s Manual Commercial Seed Tender CST 34 Series 1 2 01 2016 This page intentionally left blank ...
Страница 40: ...Operator s Manual Commercial Seed Tender CST 34 Series 4 10 01 2016 This page intentionally left blank ...
Страница 42: ...Operator s Manual Commercial Seed Tender CST 34 Series 4 12 01 2016 This page intentionally left blank ...
Страница 46: ...Operator s Manual Commercial Seed Tender CST 34 Series 6 2 01 2016 This page intentionally left blank ...
Страница 49: ......