background image

13 Troubleshooting 

13.1 Analog 

Inputs 

Problem 

Action 

20mA inputs always read 0. 

Check transmitter power. 

Reading is at or near 0 for 
all input signals. 

Check if the input transient suppressers are 
damaged. 

20mA readings are not 
accurate. 

Check for a damaged 250

 current sense 

resistor. 
Inputs are 0-20mA, not 4-20mA. 

Reading is constant. 

Check that the analog input is not forced. 

 

13.2 Analog 

Outputs 

Problem 

Action 

Outputs are always 0mA 

Check the 24V power. 

The full-scale output is less 
than 20mA. 

Check the 24V power. 
Check that the load resistance is within 
specification. 

Output is constant and 
should be changing. 

Check that the analog outputs are not forced. 

 

13.3 Digital 

Inputs 

Problem 

Action 

Input LED does not come 
on when input signal is 
applied. 

Check the input signal at the termination block. It 
should be at least 50% of the digital input range. 
If this is a DC input, check the polarity of the 
signal. 

Input is on when no signal is 
applied. The LED is off. 

Check that the digital inputs are not forced on. 

Input is off when a signal is 
applied. The LED is on. 

Check that the digital inputs are not forced off. 

Input is on when no signal is 
applied. The LED is on. 

Check that the digital output at that point is off. 

The LED is dim. 

This normal operation when the controller is in low 
power mode or sleep mode. 

 

13.4 Digital 

Outputs 

Problem 

Action 

Output LED comes on and 
output is on, but the field 
device is not activated. 

Check the field wiring. 
Check the external device. 

Output LED and output are 
on when they should be off. 

Check that the output is not forced on. 

SCADAPack LP Hardware Manual 
May 26, 2006 

 

39

Содержание SCADAPack LP

Страница 1: ...k LP Hardware Manual CONTROL MICROSYSTEMS SCADA products for the distance 48 Steacie Drive Telephone 613 591 1943 Kanata Ontario Facsimile 613 591 1022 K2K 2A9 Technical Support 888 226 6876 Canada 888 2CONTROL ...

Страница 2: ...6 and TeleBUS are registered trademarks of Control Microsystems Inc All other product names are copyright and registered trademarks or trade names of their respective owners Material used in the User and Reference manual section titled SCADAServer OLE Automation Reference is distributed under license from the OPC Foundation SCADAPack LP Hardware Manual May 26 2006 1 ...

Страница 3: ...r Control 12 5 ANALOG INPUTS 13 5 1 Internal Analog Inputs 13 5 2 I O Analog Inputs 13 5 2 1 Analog Input Connections 14 5 2 2 Analog Input Wiring 14 5 2 3 Analog Input Wiring Examples 14 5 3 Analog Input Range Jumpers 15 5 4 Analog Inputs Data Format 15 6 ANALOG OUTPUTS 17 6 1 Current Outputs 17 6 2 Voltage Outputs 17 6 3 Analog Outputs Data Format 17 7 DIGITAL OUTPUTS 19 8 DIGITAL INPUTS 20 8 1 ...

Страница 4: ...RJ 45 to DE 9S DTE 29 10 3 2 RJ 45 to SCADAPack Vision 29 10 3 3 RJ 45 to DE 9P DCE 30 10 4 COM1 RS 485 Serial Communication Port 30 10 4 1 RS 485 Bias Resistors 31 10 4 2 RS 485 Termination Resistors 31 10 5 RS 485 Wiring Examples 31 11 OPERATION 33 11 1 Operating Modes 33 11 1 1 Run Mode 33 11 1 2 Service Mode 33 11 1 3 Cold Boot Mode 33 11 1 4 Sleep Mode 34 11 2 LED Indicators 34 11 3 LED Power...

Страница 5: ...Supply 42 14 6 I O Capacity 43 14 7 Analog Inputs 43 14 8 Analog Outputs 44 14 9 Counter Inputs 44 14 10 Digital Inputs Outputs 45 15 APPROVALS AND CERTIFICATIONS 46 Index of Figures Figure 1 SCADAPack LP Controller 7 Figure 2 SCADAPack LP Board Layout 9 Figure 3 Power Management 11 Figure 4 Analog Input Wiring 15 Figure 5 Analog Output Wiring 17 Figure 6 Digital Input Output Wiring 21 Figure 7 Co...

Страница 6: ...two of which are designed for direct connection to the millivolt output of turbine meter transducers provide for a variety of connections to metering elements The I O capacity of the SCADAPack LP can be expanded using 5000 Series I O modules A maximum of forty 5000 Series I O modules may be used for a total expansion capacity of 512 digital inputs 512 digital outputs 128 analog inputs 64 analog ou...

Страница 7: ...cal Code for installations within Canada and in accordance with the authority having jurisdiction WARNING EXPLOSION HAZARD SUBSTITUTION OF COMPONENTS MAY IMPAIR SUITABILITY FOR CLASS 1 DIVISION 2 WARNING EXPLOSION HAZARD WHEN IN HAZARDOUS LOCATIONS TURN OFF POWER BEFORE REPLACING OR WIRING MODULES WARNING EXPLOSION HAZARD DO NOT DISCONNECT EQUIPMENT UNLESS POWER HAS BEEN SWITCHED OFF OR THE AREA I...

Страница 8: ...Figure 1 SCADAPack LP Controller SCADAPack LP Hardware Manual May 26 2006 7 ...

Страница 9: ...ove power before servicing unit To remove the termination connector Pull the connector upward from the board Apply even pressure to both ends of the connector To install the termination connector Line up the pins on the module with the holes in the connector Make sure all the pins line up properly Push the connector onto the pins Apply even pressure to both ends on the connector There are six conn...

Страница 10: ...Figure 2 SCADAPack LP Board Layout SCADAPack LP Hardware Manual May 26 2006 9 ...

Страница 11: ...er application program and may turned on or off Refer to section 4 2 3 12V to 24V DC DC Converter Control for more information on DC DC converter control 4 1 System Grounding In most applications it is desirable to ground the system by connecting the system power supply common to the chassis or panel ground The negative ve side of the DC power input terminal as well as all I O point terminals labe...

Страница 12: ...M3 RJ 45 connector This permits the SCADAPack Vision or an HMI pushbutton to control HMI power At each momentary contact the five minute power timer is reloaded If the five minute power timer is maintaining the HMI power on a sustained two second or longer contact between DCD and DTR will turn off HMI power Refer to section 10 3 2 RJ 45 to SCADAPack Vision for more information Internal Digital Inp...

Страница 13: ...e and rapid battery depletion When VLOOP output is turned on using internal Digital Output 10 and a short circuit is detected VLOOP will turn off VLOOP will turn on to try again 5 seconds after turning off If the fault condition still exits VLOOP will again turn off and retry after a 5 second delay While the fault condition exists internal Digital Input 12 will be ON 4 2 3 12V to 24V DC DC Convert...

Страница 14: ... operating environment of the controller and returns an integer value in the range 40 to 75 deg C or 40 to 167 deg F The temperature reading represents temperatures in the range 40 C to 75 C or 40 F to 167 F Temperatures outside this range cannot be measured For TelePACE applications use the AIN Controller Temperature register assignment to read the ambient temperature in degrees C and degrees F F...

Страница 15: ...ortant for the user to ensure that the transmitter has enough voltage for proper operation The transmitter manufacturer supplies the minimum operating voltage specification of the transmitter The analog input requires a minimum of 5V The first option is to use the SCADAPack LP VLOOP Supply that steps up the input voltage to 24V The stepped up voltage is available on the Analog Connector P10 and is...

Страница 16: ...the Voltage position of the header results in high impedance analog input 5 4 Analog Inputs Data Format The I O analog inputs have a 16 bit unipolar analog to digital A D converter that measures input voltages from 0 to 10V The analog inputs are factory calibrated to scale the data and represent it with a 15 bit unsigned number When an analog input is configured for voltage 10V input is represente...

Страница 17: ...input signals Current Channel 0 4 Voltage Channel 0 4 Voltage Channel 5 A D Output 0mA 0V 0V 0 1 22µA 0 305mV 0 001V 1 4mA 1 0V 3 277V 3277 10mA 2 5V 8 192V 8192 20mA 5 0V 16 384V 16384 39 999mA 9 9997V 32 767V 32767 SCADAPack LP Hardware Manual May 26 2006 16 ...

Страница 18: ...to 24V DC DC Converter Control for further information Figure 5 Analog Output Wiring shows example wiring of the analog outputs 6 2 Voltage Outputs To obtain voltage outputs connect a load resistor in the current output Connect the voltage device across the load resistor The table below list resistance values and output range settings for two common voltage ranges The resistance value listed is th...

Страница 19: ...D A Value Current 0 0mA 8 4 88µA 6552 4mA 16384 10mA 24576 15mA 32760 19 995mA SCADAPack LP Hardware Manual May 26 2006 18 ...

Страница 20: ...l outputs that can be controlled by the user application to manage power saving features unique to the SCADAPack LP Refer to the appropriate software manual for information on using the SCADAPack LP Digital Inputs and Outputs in application programs For TelePACE applications refer to the Register Assignment for SCADAPack LP I O module and for ISaGRAF applications refer to the I O Complex Equipment...

Страница 21: ...efer to the I O Complex Equipment for SCADAPack LP I O The SCADAPack LP I O Module provides the following digital inputs Input Type Description 0 to 7 external Dry contact inputs These inputs are located on terminal P3 0 contact open associated is LED off 1 contact closed associated is LED on 8 internal Not for use in applications Internal use only 9 internal Com3 HMI power output status 0 off 1 o...

Страница 22: ...details 15 internal reserved for future use 8 1 Digital I O Connection Examples Various I O point wiring examples are shown in Figure 6 Digital Input Output Wiring Digital I O point 0 is shown connected to a 12V load that uses the same 12V power supply that powers the SCADAPack LP Digital I O point 4 is shown connected to a 24V load and external 24V power supply Digital I O point 2 is shown monito...

Страница 23: ... open collector output 5 4 3 2 1 0 1 2 P5 Counters GND Turbine Meter Sensor GND Turbine Meter Amplifier Consult manufacturer of amplifier for wiring details J9 J10 J11 J12 1 2 1 2 Counter 1 input through internal amplifier Counter 2 input bypassing internal amplifier Figure 7 Counter Input Wiring 9 2 Turbine Meter Counter Inputs 1 and 2 The SCADAPack LP allows for the direct connection of two turb...

Страница 24: ...er Inputs 1 and 2 can be used with conventional sources such as open collector transistors and contacts The SCADAPack LP includes a 1000 ohm resistor from the counter input to the DC input power source This resistor can be used when the SCADAPack LP is powered from 12V On Counter 1 J11 would be in the External Amplifier or bottom position On Counter 2 J12 would be in the External Amplifier or bott...

Страница 25: ...nce regulations 10 1 1 COM2 RS 232 Serial Port The following table shows the serial and protocol communication parameters supported by COM2 These parameters are set from TelePACE ISaGRAF Workbench or from an application program running in the SCADAPack LP controller Default values are set when a Cold Boot or Service Boot is performed on the SCADAPack LP controller Parameter Supported Values Baud R...

Страница 26: ...ption 1 5V Output This pin can be connected to the 5V power supply by installing a jumper at J13 on the SCADAPack LP 2 DCD Input The DCD led is on for a MARK level 3 DTR Output This pin is normally at a MARK level This pin is at a SPACE level when DTR is de asserted 4 GND This pin is connected to the system ground 5 RxD Input The level is SPACE on standby and MARK for received data The LED is lit ...

Страница 27: ...lex Half Default Half Parity Odd None or Even Default None Data Bits 7 or 8 Bits Default 8 Bits Stop Bits 1 or 2 Bits Default 1 Bit Receive Flow Control ModbusRTU or None Default ModbusRTU Transmit Flow Control Ignore CTS or None Default None Station 1 to 65534 Default 1 Protocol None Modbus RTU or Modbus ASCII Default Modbus RTU Addressing Mode Standard or Extended Default Standard Connections to...

Страница 28: ...a MARK level is a voltage of 3V or greater and a SPACE level is a voltage of 0V Pin Function Description 1 5V Output 5V power for the SCADAPack Vision 2 Test1 Input Used to detect SCADAPack Vision ON switch closure 3 Test2 Output Used to detect SCADAPack Vision ON switch closure 4 GND This pin is connected to the system ground 5 RxD Input The level is SPACE on standby and MARK for received data Th...

Страница 29: ...ments The following diagram shows a common connection of an RS 232 COM port with a DTE device requiring handshaking lines RS 232 COM port DTE 8 Pin connector DTE 5 6 3 4 8 7 1 2 DCD RxD TxD DTR GND RTS CTS 5V DCD RxD TxD DTR GND RTS CTS See device specifications for pin numbers 10 2 3 DTE to DCE with Handshaking DCE devices require different wiring The handshaking lines must be connected in most c...

Страница 30: ...unction DE9S DTE Function DE9S Shield connects to shell 6 TxD RxD 2 5 RxD TxD 3 4 GND GND 5 1 2 3 7 and 8 are not connected at this end Wires not connected at this end 10 3 2 RJ 45 to SCADAPack Vision This cable is used to connect from an RJ 45 based RS 232 port on the SCADAPack LP controller to DE 9P connector on a SCADAPack Vision A 5 ft long cable is available from Control Microsystems as part ...

Страница 31: ... the SCADAPack LP controller is configured as a two wire RS 485 serial communication port The following table shows the serial and protocol communication parameters supported by COM1 These parameters are set from TelePACE ISaGRAF Workbench or from an application program running in the SCADAPack LP controller Default values are set when a Cold Boot or Service Boot is performed on the SCADAPack LP c...

Страница 32: ... 2 RS 485 Termination Resistors Termination resistors are required in long networks operating at the highest baud rates Shorter networks in high noise environments may also benefit from terminations Networks as long 1000 ft operating at 9600 baud will function without termination resistors Terminations should be considered if the baud rate is higher and the network is longer When termination resis...

Страница 33: ...7 6 A B P6 RS 485 1 2 P3 DC Power In 12Vdc Power Supply _ A B PWR PWR SCADAPack LP Rosemount 3095 MVT Figure 9 RS 485 Wiring SCADAPack LP Hardware Manual May 26 2006 32 ...

Страница 34: ... ROM then the flash ROM program will be executed The controller lock settings and password are used 11 1 2 Service Mode SERVICE mode is used during application programming and maintenance work When the SCADAPack LP controller starts in SERVICE mode The default serial communication parameters are used see section 10 Serial Communication for a description of the default parameters The TelePACE Ladde...

Страница 35: ... sleep mode The user s TelePACE or ISaGRAF application program can enable and disable sleep mode by using the SLP or SLEEP functions respectively During sleep mode the following happen All programs stop executing The 5V power to most of the circuit of the controller is switched off The 5V power to the I O bus is switched off The three counter inputs on the controller board continue to function The...

Страница 36: ... the controller board indicates the LED power state It is on when the controller board enables LED power The LED POWER push button toggles the LED power signal Press the LED POWER push button to toggle LED power from off to on or from on to off The application program sets the default state of the LED power The LED power returns to the default state 5 minutes after the LED POWER push button is las...

Страница 37: ...tus code 1 i e a long flash once every second there is a communication failure with one or more I O module To correct the problem do one of the following 1 Ensure that every module contained in the Register Assignment Table is connected to the controller Check that the module address selected for each module agrees with the selection made in the Register Assignment Table 2 If a module is still sus...

Страница 38: ...orrect the cause of the fuse failure before replacement Common causes of fuse failure are short circuits and excessive input voltages 12 2 Lithium Battery A small lithium battery powers the CMOS memory and real time clock when input power is removed The voltage of a functioning battery should be greater than 3 0V An application program can monitor this voltage Refer to the programming manual for d...

Страница 39: ...ction 11 1 3 Cold Boot Mode in of this manual for the Cold Boot procedure Warning If a cold boot is not done the behavior of the controller is unpredictable 8 The controller may now be programmed SCADAPack LP Hardware Manual May 26 2006 38 ...

Страница 40: ...ED does not come on when input signal is applied Check the input signal at the termination block It should be at least 50 of the digital input range If this is a DC input check the polarity of the signal Input is on when no signal is applied The LED is off Check that the digital inputs are not forced on Input is off when a signal is applied The LED is on Check that the digital inputs are not force...

Страница 41: ... controller is in sleep mode 13 5 Counter Inputs Problem Action Input LED does not come on when input signal is applied Check the input signal at the termination block It should be at least 50 of the counter input range The LED is dim This normal operation when the controller is in low power mode or sleep mode SCADAPack LP Hardware Manual May 26 2006 40 ...

Страница 42: ...rocontroller co processor 14 74MHz clock Memory 1MBytes CMOS RAM 512kBytes flash ROM 1kBytes EEPROM Non volatile RAM CMOS RAM with lithium battery retains contents for 2 years with no power Clock calendar 1 minute month at 25 C 1 3 minutes month 0 to 50 C Internal temperature Measurement range 40 C to 75 C Accuracy 5 C Measurement range 40 F to 167 F Accuracy 9 F Lithium battery monitor Accuracy 0...

Страница 43: ...und return connected to Chassis Ground Cable Length RS 232 maximum 10 ft 3 m RS 485 maximum 4000 ft 1200 m Protocol TeleBUS compatible with Modbus RTU and Modbus ASCII Protocol Modes Slave master master slave store and forward 14 4 Visual Indicators COM1 received data Rx LED transmitted data Tx LED COM2 received data Rx LED transmitted data Tx LED clear to send CTS LED data carrier detect DCD LED ...

Страница 44: ...ules 32 counter inputs using 4 point counter input modules Example 16 of the 32 point digital output modules 16 of the 32 point digital input modules 8 of the 8 point analog input modules would yield an expansion of 1088 I O points 14 7 Analog Inputs Input Points 5 at 10V 20mA 250Ω resistance user configurable with jumper link 1 at 32 768V Resolution 15 bits over the 10V and 32 768V measurement ra...

Страница 45: ...C37 90 1 1989 Response Time 0 5ms to 2ms for 10 to 90 signal change Power Requirements 24V boost power supply off Vin X output current 24V boost power supply on 27 X output current 14 9 Counter Inputs Counter Inputs Counter 0 Digital Input Counter Counter 1 Turbine Meter inputs Counter 2 Turbine Meter inputs Digital Input Counter 0 Maximum frequency 10Hz Dry contact input Wetting current typically...

Страница 46: ...ontact closure to ground is ON Open input is OFF Digital Input Thresholds 0 9V typical turn on input voltage Less than 0 4V guaranteed turn on input voltage 1 5V typical turn off input voltage Greater than 2 2V guaranteed turn off input voltage Contact Resistance ON input requires less than 100Ω contact resistance OFF input requires greater than 50kΩ contact resistance Cable contact capacitance no...

Страница 47: ...Industrial Environment Immunity EN61000 6 2 1999 Electromagnetic Compatibility Generic Standards Immunity for Industrial Environments Declaration This product conforms to the above Emissions and Immunity Standards and therefore conforms with the requirements of Council Directive 89 336 EEC as amended relating to electromagnetic compatibility and is eligible to bear the CE mark The Low Voltage Dire...

Отзывы: