Operating elements
8
x
5
x5
20cm
150cm
100cm
x10
x10
x1
x1
(cardboard)
x1
x5
1
4
5
6
7
2
3
1. Smart lines with mounting plates
2. Dowels
3. Screws
4. Connectors
5. MCU
6. Power adapter
7. Mounting cardboard
8. 3M double-sided tape
Operation
a) Mounting with double-sided tape
The smart line can be applied to most flat and clean surfaces. After removing the double-sided
tape backing, press the product firmly on the wall for about 20 seconds.
A1
x1
3
20s
(b)
(a)
x1
2
1
(a) 1x slot for
power input
(b) 3x slots for power output
1
A3
20s
A2
x1
x1
x3
2
x3
x1
x3
2
3
1
repeat
1
2
4
5
A4
3 20s
x1
x1
Your system will automatically detect the number of elements when all elements are connected
and the power is turned on. In the event of defective elements, check whether all connectors
are correctly inserted and then switch the power on again.
b) Mounting with screws
B1
B2
x 1
10x φ5mm
1
2
3
4
5
6
7
8
9
10
x 10
B3
B4
2
3
4
5
6
x10
x5
1
x1
(b)
(a)