7. Feed fiber through the machine, seals, and venturi into the duct. (Figure 11)
8. Feed fiber through machine and mark the fiber at the back end of the GS 350. (Figure 12)
9. Pull 10' (3 m) of fiber back out of the duct. (Figure 13)
10. Set the motor pressure and clamp pressure. With small fiber, start at 20psi. (Figure 14)
11. Belts should be in the open position and air valve should be off. (Figure 27)
12. Lower the belts to engage the fiber. Turn air on and engage belts, which will start the
belts. Fiber should be installing. (Figure 16)
Figure 11. Run the Fiber
Figure 12. Mark the Fiber
Figure 13. Pull Back Fiber
Figure 14. Set Pressure
Figure 15. E-Stop On
Figure 16. Lower Belts