background image

8

Nortec EL

Electrical continued...

Safety Chain and Control Signal Connections

1.  If a blower pack is installed, then connect it to terminal points “8” 

and “9” on the low voltage terminal strip. Make sure that no other 

wires are connected to these terminal points. If using multiple blower 

packs, make sure that they are connected in series. Install a jumper 

between terminal points “8” and “9” if a blower pack is not used.

2.  Connect external monitoring devices (for example, high limit humi-

distat, air proving switch, etc.) in series to terminal points “1” and “2” 

on the low voltage terminal strip. Install a jumper between terminal 

points “1” and “2” if external monitoring devices are not used (not 

recommended).

3.  Connect  an  external  humidity  sensor  input  or  direct  demand 

modulating input to terminal points “3” and “4” on the low voltage 

terminal strip. Do not connect multiple modulating signals to the 

same modulating input on the humidifier. If necessary, a second 

modulating signal can be connected to terminal point “5” and “3”, 

using terminal point “3” as common.  

Note:

 If the cable shielding is 

already connected to a potential or a grounded conductor, do not 

connect it to terminal point “3”. 

4.  If a 24 V On/Off humidistat is used, connect the input to the terminal 

points “4” and “6” on the low voltage terminal strip. When connecting 

a 24 V On/Off humidistat, set the jumper JP1 on the driver board to 

24 V (so that terminal point “6” will output 24 VDC).

5.  If an external On/Off input is used to control the humidifier, connect 

it to connector X11 on the driver board.

 

CAUTION!

Risk of damage to internal component.

 

DO NOT apply voltage 

to low voltage terminal strip terminal points “1” and “2” through the 

contacts of the external On/Off devices.

+

max

φ

Δp

External

Blower pack

GND

10/24 Vdc

(+) Limit signal

(+) Control signal

(-) Signal

Safety loop

7

8

6

6

JP1

10V

24V

3

LV

8

7

6

5

4

3

2

9

1

5

4

2

1

1   Modulating demand or humidity sensor signal (additional)

2   Modulating demand or humidity sensor signal

3   24 V On/Off humidistat (jumper JP1 must be set to 24 V)

4   High limit humidistat

5   Air proving switch

6   Jumper

7   Low voltage terminal strip

8   Blower pack

Содержание Nortec EL005

Страница 1: ...r Overview 2 Mounting 3 Installation Requirements 3 Standard Mounting 4 Steam Distribution 5 Installation Requirements 5 Plumbing 6 Water and Drainage Requirements 6 Electrical 7 Installation Requirements 7 External Power Connections 7 Safety Chain and Control Signal Connections 8 2583578_B_EN_1811_Nortec EL_QSG ...

Страница 2: ... humidistat used for control of the space in the return duct high limit in the supply duct 3 On Off humidistat used for humidity control 4 Steam line 5 Electrical disconnect high voltage supply 6 Drain line 7 Air gap funnel with optional trap 8 Water supply 9 Condensate line 10 Steam distributor 11 Air proving switch external safety chain 12 Supply air duct 13 Return air duct ...

Страница 3: ...surfaces that can freeze or near vibrating components or on the floor In addition the mounting surface must be able to withstand temperatures of 140 158 F 60 70 C that can be generated during operation of the humidifier 6 Thehumidifiershouldbemountedonawallorothersuitablesurface that offers a sufficiently high load bearing capacity 7 The Nortec ELhumidifier should be installed in a drip proof loca...

Страница 4: ...g bolts 5 Alignthehumidifierwiththehelpofalevel thentightenthelagbolts 6 Install additional lag bolts supplied by others into the mounting surface at attachment points B and fasten securely 7 Reinstall the door panels and fasten them securely Refer to Mounting the Humidifier in the Installation Manual Condair documentnumber2582302 forothermountingarrangements including OSHPD seismic mounting arran...

Страница 5: ... the steam line 11 Upon completion of installation purge the steam and condensate lines to remove any contaminants or construction material 12 Prime the condensate traps with water Refer to Steam Line Connections in the Installation Manual for other details 10 o 2o 12 in 300 mm 2 in 50 mm 12 in 300 mm in 12 mm Minimum Upslope Minimum Downslope 1 2o 1 in 25 mm 48 in 1 2 m 1 2o 1 in 25 mm 48 in 1 2 ...

Страница 6: ...ne with a minimum internal diameter of 7 8 in 22 mm and secured with clamps 7 The drain line should be as short as possible and have a constant minimumdownslopeof1in 48in 1 2 tothefunnelwithouttouching its sides or bottom Use stainless steel or plastic pipe suitable for temperatures up to 212 F 100 C 8 Drain lines from large humidifiers with dual steam cylinders must empty into separate air gap fu...

Страница 7: ...tallation work has been completed 4 All cables must enter the control cabinet in the humidifier through appropriatecableglandsorgrommets andmustbeproperlysecured to prevent fraying or become a tripping hazard Referto ElectricalConnections intheInstallationManualforotherdetails DANGER Risk of electric shock The Condair humidifier is mains powered and should only be wired by a licensed electrician C...

Страница 8: ... signal can be connected to terminal point 5 and 3 using terminal point 3 as common Note If the cable shielding is already connected to a potential or a grounded conductor do not connect it to terminal point 3 4 If a 24 V On Off humidistat is used connect the input to the terminal points 4 and 6 onthelowvoltageterminalstrip Whenconnecting a 24 V On Off humidistat set the jumper JP1 on the driver b...

Страница 9: ...Notes ...

Страница 10: ...e with local and national electrical code requirements by a licensed electrician All water supply and drain line connections must be installed in accordance with local plumbing codes by a licensed plumber Condair does not accept any liability for installations of humidity equipmentinstalledbyunqualifiedpersonnelortheuseofparts com ponents equipment that are not authorized or approved by Condair US...

Отзывы: