15
Brine line:
Use the brine line to connect the injector at the control head with the brine valve in the brine tank
(PE hose).
Raw water connection:
Connect the raw water pipe to the raw water connection via the on-site shut-off valve.
Soft water connection:
Connect the soft water connection to the consumer(s).
Waste water connection:
Route the rinsing output of the control head and the overflow connection of the brine tank to the
free input in the waste water connection by means of one fabric hose respectively.
INSTRUCTION
All pipe connections must be connected when the system is not live. Ensure that no squeezing
or kinking of the hoses occurs and screw hose connections tightly. The concentrate and drain
lines must be routed with a downward slope to the free wastewater input. The waste water
must be allowed to flow off without backpressure.
Installation and assembly
INSTRUCTION
Negative pressure must not be generated in the exchanger tank or other components of the
softening system under any circumstances. If necessary, an additional ventilation valve to
prevent negative pressure must be installed on-site.
Содержание CONDAIR SOFT
Страница 31: ...31 Appendix 9 3 Electrical connection...
Страница 48: ...48 9 5 1 Soft 60 System drawing Appendix...
Страница 49: ...49 9 5 2 Soft 120 System drawing Appendix...
Страница 50: ...50 9 5 3 Soft 200 System drawing Appendix...
Страница 51: ...51 9 5 4 Soft 320 System drawing Appendix...
Страница 52: ...52 9 5 5 Soft 400 System drawing Appendix...
Страница 54: ...54 Notes...
Страница 55: ...55 Notes...