Concoa 536 Series Скачать руководство пользователя страница 5

Comply with all safety rules and precautions of the following:

 

 

1.  American National Standards Institute standard Z49.1 or Safety inWelding and Cutting, 

American Welding Society, 2501 NW Seventh Street, Miami, FL 33125.

 

2.  N.F.P.A. Standard 51, Oxygen-Fuel Gas Systems for Welding and Cutting, N.F.P.A., 470 Atlantic 

Avenue, Boston, MA 02210.

 

3.  N.F.P.A. Standard 51B, Cutting and Welding Processes, (see Address in #2)

 

4.  CONCOA Publication ADE 872, Safety Precautions in Welding and Cutting.

 

5.  Local ordinances.

 

6.  O.S.H.A.

 

7.  C.G.A. Pamphlet C-4, American National Standard Method of Marking Portable Compressed 

Gas Containers to Identify the Material Contained.*

 

8.  C.G.A.PamphletG-4, Oxygen-Information on the properties, manufacture, transportation, 

storage, handling, and use of oxygen.

 

9.  C.G.A. Pamphlet G-4.1, Equipment Cleaned for Oxygen Service.

 

10. C.G.A. Pamphlet C-4.4, Industrial Practices for Gaseous Oxygen Transmission and Distribution 

Piping Systems.

 

11. C.G.A. Pamphlet G-5, Hydrogen - Information on the properties, manufacture, transportation, 

storage, handling, and use of hydrogen.

 

12. C.G.A. Pamphlet G-6, Carbon Dioxide - Information on the properties, manufacture, 

transportation, storage, handling, and use of carbon dioxide.

 

13. C.G.A. Pamphlet G-6.1, Standard for Low Pressure Carbon Dioxide Systems at Consumer Sites.

 

 

  

INSTALLATION

   

The  site  chosen  for  the  installation  of  the  system  shall  be  level,  well  ventilated,  and  at  a  safe 
distance from sources of flames, sparks, and excessive heat. The system should not be placed in 
an area that may subject it to damage from passing trucks, cranes, or other heavy machines. Any 
oxygen system must not be installed under shafting, belting, or other places where oil can drip on it. 
Refer to the manifold instructions for manifold installation.

 

a.  Be sure to consider all factors when selecting materials.

 

b.  Do not use oil or grease on fittings.

 

c.  Be sure that all fittings are secure and leak tight. PTFE tape must be used on pipe threads. 

See Figure 6.

 

d.  Relief  valve:  The  purpose  of  the  relief  valve  is  to  protect  the  AutoSwitch  system  and  its 

components  only  (Figure2).  If  there  is  pressure  sensitive  equipment  downstream  of  the 
AutoSwitch system, it is recommended that an appropriately sized relief valve be installed in 
the line to protect this equipment.

 

e.  Purge devices: These devices can be purchased as accessories. Purge devices are used to 

remove toxic, 

corrosive, or flammable gases from the customer’s system to a safe discharge 

area.  This  is  particularly  helpful  when  an  internal  problem  occurs  such  as  regulator 
malfunction.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

Figure 2

 

 

 

-5-

 

 

Содержание 536 Series

Страница 1: ...s AutoSwitch Systems For Use with Liquid Cylinders and High Pressure Gases in High Purity Applications INSTALLATION AND OPERATION INSTRUCTIONS Controls Corporation of America 1501 Harpers Road Virgini...

Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK 2...

Страница 3: ...imary bank falls below this value gas will be pulled from the reserve side Models of these AutoSwitches are available with or without pressure switch gauges Models with pressure switch gauges can be c...

Страница 4: ...ifold Always leak test any manifold or distribution pipeline before using Always be sure that the gas in a pipeline is the correct gas for the intended use Always install a blind gland and nut or pipi...

Страница 5: ...use of carbon dioxide 13 C G A Pamphlet G 6 1 Standard for Low Pressure Carbon Dioxide Systems at Consumer Sites INSTALLATION The site chosen for the installation of the system shall be level well ve...

Страница 6: ...oint extending approximately 10 inches to the left and right of center 3 Remove the mounting bracket from the rear of the AutoSwitch console by removing the retaining nuts at the bottom of the mountin...

Страница 7: ...ad sealant that remains on the threads d Start the PTFE tape on the first thread leaving a slight section of the chamfer exposed as shown in Fig 6 Make sure the tape does not overlap the end of the fi...

Страница 8: ...the cylinder of gas to the work site a Secure cylinder to the floor wall or bench with appropriate chain strap or stand to prevent toppling b Remove the cylinder cap c Be sure the cylinder valve is ti...

Страница 9: ...ns if compatible with the application which indicates leaks by bubbling To further check for leaks or if the leak detection solution cannot be used close the cylinder valve for a period of time recomm...

Страница 10: ...e switchover point of the AutoSwitch The alarm is used to provide an audible and visual warning that a changeover is about to occur If the nearly depleted cylinders are changed when the alarm LEDs ill...

Страница 11: ...cylinders simultaneously pressure is decreasingonboth inletgaugesatthesametime 1 Observe the inlet pressure It may be necessary to do this during times of the heaviest use If the inlet pressure is le...

Страница 12: ...rvice Please contact a Customer Service Representative at 1 800 225 0473 to receive this number You will be asked to provide 1 Model Number 2 Gas Service 3 Inlet pressure and type of gas supply 4 Outl...

Страница 13: ...THIS PAGE INTENTIONALLY LEFT BLANK 13...

Страница 14: ...THIS PAGE INTENTIONALLY LEFT BLANK 14...

Страница 15: ...ther than CONTROLS CORPORATION OF AMERICA or if the equipment has been subject to abuse misuse negligence or accident CONTROLS CORPORATION OF AMERICA s sole and exclusive obligation and Buyer s sole a...

Страница 16: ...ADI 3198 D Certified ISO 9001 Controls Corporation of America 1501 Harpers Road Virginia Beach VA 23454 Telephone 1 800 225 0473 or 757 422 8330 Fax 757 422 3125 www concoa com...

Отзывы: