
8
Step 13: Measure the installed bracket mounts.
Measure the distance (y) between
the mounting hole of the brackets
as shown.
Step 11: Position brackets.
Position the brackets to match
measurement (x), from step 8.
(x)
Step 12: Fix brackets in place.
Fix the brackets into position. Be
sure the channel nuts are
positioned correct, under the
mounting holes in the brackets.
Slide the M8 hardware through the
brackets and into the channel nuts
of the platform. Tighten to 8-10Nm
with 5mm allen key.
(y)
Inner mounting hole can be used if
outer is unavailable.
14
15
13