5
Step 3: Insert channel nuts into planks.
Slide 2x channel nuts (spring
facing upward) into the ends of
each plank.
Place approx. 5mm/ 3/16” in
from end of planks.
5mm/ 3/16”
Step 4: Insert channel nuts into planks.
Place the planks into position
over the mounting holes in the
sides of the frame.