
4
Step 2D: Fix the corner mouldings.
Fix the corner brackets to the
underside of the complete
frame with the M6 counter
sunk screws provided. Tighten
to 4-5Nm (3-4ft/lb).
Flip the platform top side up
when complete.
Step 2C: Flip over platform.
With aid, carefully
fl
ip the
platform, bottom side up.
(A)
(B)
(C)