4. Design and functioning
23
Automatic operation
•
If the mains pressure achieves the preset maximum
value, then the electric motor (-3-) will have its
speed lowered in order to allow for the delivery
amount to adapt to the actual need for compressed
air.
•
If the motor has reached minimum speed and the
load-system pressure continues to rise, solenoid
valve (-25-(Y4)) is deenergized (opened) and
solenoid valve (-26-(Y11)) continues energized
(open). Reservoir pressure is reduced to approx. 4 to
4.5 bar and the pressure-maintenance valve (-7-)
closes.
•
This way, no more compressed air will be supplied
to the mains.
•
If the mains pressure does not drop to the target
value within the programmed follow-up time, then
the system will shut down.
•
If the target value is achieved before the expiration
of the programmed motor follow-up time, then the
magnet valve will again be energized (-25-(Y4)).
•
The system will then go into load runs.
Содержание D110H RS
Страница 2: ......
Страница 58: ...11 Annex 56 11 2 Layout plan 11 2 1 Layout plan D110H RS Fig 32 all dimensions in mm...
Страница 59: ...11 Annex 57 Fig 33 all dimensions in mm...
Страница 60: ...11 Annex 58 11 2 2 Layout plan D50H RS D75H RS Fig 34 all dimensions in mm cooling air cooling air...
Страница 61: ...11 Annex 59 Fig 35 all dimensions in mm...
Страница 63: ......