12.
Installatio
n Ch
eck
list
Installation Checklist
Before leaving site, ensure the installation checklist is completed. If any of the following tests
fail, please contact Helpdesk.
Mechanical
Yes
No
Check that the unit has been securely bolted down.
Check all panels are securely fastened.
Check that all cable entries to OPT are through glands.
Wiring
Yes
No
Check that power has been connected to the main breaker in the OPT.
Check that the phone line is connected to the router. (Wired ADSL units)
Check that the SIM card has been inserted into the modem and the aerial
wired and mounted appropriately. (Wireless internet OPTs)
Check that the pump comms have been connected.
Check that the tank gauging is connected and operating correctly (where
fitted). Replace ATG cable to OPT where possible.
Power On Tests
Yes
No
Check that the CE board, FMS board, pinpad, printer, cardreader, router
and modem all power up.
Check that the router logs in and is able to access the internet using a
laptop and network cable plugged into the router.
Get the installer to call the number on the back of the pinpad and get the
PIN pad activated. (NZ only at present)
Make sure the pumps are re-priced by the OPT to the current fuel price.
Check that different fuels are correctly priced on all hoses.
Check that the site logs onto CompacOnline and that a temperature is
recorded at site.