13.
Installatio
n Ch
eck
list
Transaction Tests
Yes
No
Check that all pumps can be selected when starting a transaction on the
PIN pad.
Check that the correct $, L and fuel grade are printed on the receipt and
that a receipt is issued after each transaction when the card is re-swiped.
Check that the transactions that appear on CompacOnline match up to the
receipt information that is printed on site.
Check that date and time zones are correct.
Tank Information Tests (where fitted)
Yes
No
Check that tanks are set up in CompacOnline and that correct information
from the equipment is being displayed on screen.
Check that the correct fuels have the correct levels and that one fuel is not
being reported as a different fuel.
VoIP Tests (where fitted)
Yes
No
Press the green button on the front of the unit and complete a test call to
the service centre. It should be a clear conversation at both ends.
Finishing
Yes
No
Ensure all cables are plugged back in after remote accessing.
Check that door switch alarm has cleared.
Tidy up all rubbish and clean the OPT before leaving.