Model 2 Starter
17
Checklist in order of installation:
1 single platform landing?
2 post extenders on top of 2 short posts?
1 stair, 2 short posts at bottom, and 1 stair, 2 stair railings with 4 short couplings?
4 short clear panels, 2 solid panels, 1 diagonal arch, and 3 single arches to complete
the second layer?
All panels and couplings held properly by the connectors?
Tom’s loft
2
2