The Community Loft
20
Maria’s loft
Checklist in order of installation:
8 long and 2 short posts?
8 arch supports
as shown in Floor
Plan?
4 single arches and 5 single solid panels
in bottom layer?
1 single and 1 double arch on second
level to hold structure together?
All panels, arches and
arch supports
held properly with connector rings?
Floor Plan - First Level
8
Arch Supports
1
Arch Support
Arch Support