background image

Model 2 Starter

11

15

  Slide another connector ring flat side 

down onto each post. 

18

  Check all the joints. Then, add the sec-

ond layer stairs the same way you put in 

the first layer stairs.

17

  Screw post extenders on top of each 

post which goes to the third layer. Do 

not over- tighten the posts. Align the 

sides. A slight looseness will not affect 

the stability of the finished loft.

16   

  Lay the platforms in place. Any half-

circle holes should be filled with the 

half

-circle plug at this time.

Содержание L310 Starter 2

Страница 1: ...TheCommunityLoft L310 MODEL 2 STARTER PRODUCT GUIDE Model 2 Starter...

Страница 2: ...e contains important infor mation Please save for future reference You may want to move your loft or change your loft configuration later on This product is intended for use by children of immature ju...

Страница 3: ...our loft When you are done you might have some parts left over Keep them for possible future use We have also included instructions for taking your loft apart and trying a new configuration Important...

Страница 4: ...e you have all the parts shown on these pages before beginning to build your loft If any parts are broken or missing do not try to assemble your loft Call Customer Service right away 800 777 4244 and...

Страница 5: ...Model 2 Starter 5 1 Double Dowel Panel 4 Short Posts 1 Double Arch 1 Double Platform 2 Single Platforms 2 Stairs 2 pair of Stair Railings...

Страница 6: ...ill need a friend to help you It takes four hands to build a loft but no tools at all These basic skills are for building any of the loft patterns in this book After you have read them through choose...

Страница 7: ...ew panel Assemble your loft by followingthepat ternyouhavechosen see pages 12 13 Go slowly it is not easy to replace a panel after a layer is placed on top 5 Check the joints Every panel should be loc...

Страница 8: ...another connector ring flat side down onto each post 8 Screw post extenders on top of the short posts which will support your landing Do not over tighten the posts Align the sides A slight loose ness...

Страница 9: ...nd up to the top end of the railing by sliding the metal connectors over their mates on the railing Attach a 22 coupling in the same way to the bottom end of the railing The sub assem bly should appea...

Страница 10: ...have chosen 12 Add the railings The railings slide into slots on the stairs with the bottom label down Hint Hold couplings and press down 14 Any stair railing which connects to a tall post at its base...

Страница 11: ...same way you put in the first layer stairs 17 Screw post extenders on top of each post which goes to the third layer Do not over tighten the posts Align the sides A slight looseness will not affect t...

Страница 12: ...llow the same procedure as you did in Step 11 for the lower stairs However note that on the lower stairs the 4 couplings that are used are 22 long On these upper stairs the 2 cou plings on the top are...

Страница 13: ...Make sure all panels are where you want them to be Then fill the hole between platforms using a circular plug Step on the plug to lock it in place 23 Screw a cap onto each post to lock the constructio...

Страница 14: ...look at them to see what the first floor is like Tom s loft has doors stairs and crawl through tunnels on all sides great for the center of the room or as a room divider Placed in the middle of a larg...

Страница 15: ...erella s grand entrance The double arch below makes the lower level feel big enough for a ballroom while the tunnel under the landing is a nifty place for the fairy godmother to hide Because the inter...

Страница 16: ...ts as shown in Floor Plan 4 single arches and 5 single solid panels in bottom layer 1 single and 1 double arch on second level to hold structure together All panels arches and arch supports held prope...

Страница 17: ...tenders on top of 2 short posts 1 stair 2 short posts at bottom and 1 stair 2 stair railings with 4 short couplings 4 short clear panels 2 solid panels 1 diagonal arch and 3 single arches to complete...

Страница 18: ...ist in order of installation 1 single and 1 double platform on top with a half circle plug 8 post extenders on top of long posts 1 stair 2 stair railings with 2 short couplings at bottom and 2 long co...

Страница 19: ...tarter 19 Checklist in order of installation 7 upper panels All panels stairs and couplings held properly by the connectors 12 caps screwed down tight Refer to Safety page Levelling feet adjusted Tom...

Страница 20: ...h supports as shown in Floor Plan 4 single arches and 5 single solid panels in bottom layer 1 single and 1 double arch on second level to hold structure together All panels arches and arch supports he...

Страница 21: ...t extenders on top of 2 short posts Stair with 1 short post at bottom 2 stair railings with 4 short couplings 4 short clear panels 2 solid panels 1 diagonal arch and 3 single arches to complete the se...

Страница 22: ...st in order of installation 1 single and 1 double platform on top with a half circle plug 8 post extenders on top of long posts 1 stair 2 stair railings with 2 short couplings at bottom and 2 long cou...

Страница 23: ...2 Starter 23 Checklist in order of installation 7 upper panels All panels and couplings held properly by the connectors 11 caps screwed down tight Refer to Safety page Levelling feet adjusted Maria s...

Страница 24: ...single arches and 5 single solid panels in bottom layer 8 arch supports as shown in Floor Plan 1 single and 1 double arch on second level to hold structure together All panels arches and arch support...

Страница 25: ...post extenders on top of 2 short posts Stair with 2 short posts at bottom 2 railings with 4 short couplings 4 short clear panels 2 solid panels 1 diagonal arch and 3 single arches to complete the seco...

Страница 26: ...t in order of installation 1 single and 1 double platform on top with 1 half circle plug 8 post extenders on top of long posts 1 stair 2 stair railings with 2 short couplings at bottom and 2 long coup...

Страница 27: ...2 Starter 27 Checklist in order of installation 7 upper panels All panels couplings held properly by the connectors 12 caps screwed down tight Refer to Safety page Levelling feet adjusted Annette s l...

Страница 28: ...arch supports as shown in Floor Plan 4 single arches and 5 single solid panels in bottom layer 1 single and 1 double arch on second level to hold structure together All panels arches and arch supports...

Страница 29: ...st extenders on top of 2 short posts Stair with 1 short post at bottom 2 stair railings with 4 short couplings 4 short clear panels 2 solid panels 1 diagonal arch and 3 single arches to complete the s...

Страница 30: ...st in order of installation 1 single and 1 double platform on top with 1 half circle plug 8 post extenders on top of long posts 1 stair 2 stair railings with 2 short couplings at bottom and 2 long cou...

Страница 31: ...2 Starter 31 Checklist in order of installation 7 upper panels All panels and couplings held properly by the connectors 11 caps screwed down tight Refer to Safety page Levelling feet adjusted Robin s...

Страница 32: ...sh the wooden parts of your loft but remember wood and water are natural enemies Don t soak work fast use a stiff brush with soap and water or a detergent as you would for washing dishes When cleaning...

Страница 33: ...is solution Rub gently Blot rinse with water and blot again 3 Apply white vinegar to remove the cleaning solution Blot rinse with water and blot dry For berry blood chalk fruit juices ice cream ketchu...

Страница 34: ...plugs This picture shows platforms removed for clarity Remove platforms only after plug has been removed 1 Start at the top of the loft and work downward Unlock the childproof caps on the posts by pu...

Страница 35: ...not become unstable Gen erally if there is a right angle in the wall it will still stand 4 Take the stair railings off by lifting straight up Then you can remove the stairs A sharp tap on the bottom o...

Страница 36: ...v V community playthings CUSTOMER SERVICE United States PO Box 2 Ulster Park NY 12487 Office hours 9 5 EST Phone 800 777 4244 Fax 800 336 5948 845 572 3468 www CommunityPlaythings com Sales CommunityP...

Отзывы: