![CommScope SYSTIMAX iPatch Panel Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/commscope/systimax-ipatch-panel/systimax-ipatch-panel_managers-manual_2643685029.webp)
Chapter:
Installing the iPatch Equipment
2–13
5
Wait until the iPatch Manager display shows:
Then:
6
Press Continue to program the order of panels and modules on the rack.
The iPatch Manager sounds a key beep and the display shows:
7
Press a button on the top-most row of iPatch Panel ports on the rack.
The iPatch Manager sounds a completion tone, the associated LED turns on,
and the display shows:
Important:
For 48-port panels, you must first press a button on the top row of
the panel and then press a button on the bottom row. For modular shelves, you
must press a button on each module, working from left to right. If you are
programming the order of a series of modular shelves and there is no module in
the right-most position of a shelf, press Next after you program the order of the
last module in the shelf before moving to the next shelf.
8
Press a button on the next lower row of iPatch Panel ports on the rack.
The iPatch Manager sounds a completion tone, the associated LED turns on,
the LED on the previous panel turns off, and the display shows:
Initializing
Please Wait
Rack 1
Program Order of
iPatch Equipment in Rack
Press Continue to order panels and
modules.
Continue Cancel
Looking for 1 of 60
Program Order of
iPatch Equipment in Rack
Working from top to bottom and left to
right, press the first port button on
each row and module.
Cancel
Rack 1
Looking for 2 of 60 Rack 1
Program Order of
iPatch Equipment in Rack
Working from top to bottom and left to
right, press the first port button on
each row and module.
Start Over Cancel
Looking for 3 of 60 Rack 1
Program Order of
iPatch Equipment in Rack
Working from top to bottom and left to
right, press the first port button on
each row and module.
Start Over Cancel