Step 4 – Installing the Patch Cord Trough 

A 1U-17 Patch Cord Trough (ordered separately) can be installed for routing patch cords to the faceplate and to 
serve as a handle for sliding the tray. 

To install the patch cord trough: 

1.  Loosen the two #8-32 x 3/4 inch screws holding the faceplate on the shelf (Figure 5). 

2.  Position the trough over the faceplate and tighten the two screws (Figure 5). 

3.  Install an adhesive-backed wire retainer (provided) on each end of the trough as shown in Figure 5. 

Note:

  Each wire retainer can hold up to 6 duplex patch cords. 

            

 

Figure 5  Installing the Trough on the Shelf 

Step 5 – Installing Cable 

Directions are provided in the sub-sections below for preparing the fiber optic cable and connecting it to the 
faceplate connectors. 

 

Figure 6  Preparing the Cable for Termination or Splicing 

Faceplate

Trough

Wire retainers (2)

Screws (2)

 

Buffered fiber

Fiber optic cable

42 in

(106.7cm)

 

Содержание iP-600B-12-CSC-SMF

Страница 1: ...e system must be Version 6 2 or later We recommend that you upgrade the System Manager software to Version 6 2 or a later version before you install the shelf System Manager will automatically upgrade the iPatch Manager software Ordering information is listed below Material ID Part No Description 760005629 iP 600B 12 SC MMF 600B sliding multimode intelligent fiber shelf SC 12 port duplex 760080895...

Страница 2: ...ble ties 3 Fiber type labels 8 labels each sheet 1 Double sided tape 6 inches 15 2cm for mounting splice organizers 1 Instruction sheet Separately Orderable Components Material ID Part No Description 700006257 1AF1 16LG Fusion splice organizers 700006281 1AMF1 6LG Mass fusion organizers 700006240 1AM1 12LG Mechanical splice organizers 760002348 1U 17 Patch Cord Trough Specifications Fiber Optic In...

Страница 3: ...ch has a preferential bend axis Use caution to avoid kinking trunk cables iPatch high density fiber MPO adapters are equipped with protective dust caps installed in the front of all adapters Prior to installation clean the trunk cable and jumper connectors per the manufacturer s recommendations All wiring that connects to this equipment must meet applicable local and national building codes and ne...

Страница 4: ...ng around the end of the sliding rail to the outside of the rail 4 Snap the corrugated tubing protecting the panel bus jumper into the cable retainer on the outside of the rail as shown in Figure 2 Position the corrugated tubing so that about 1 inch 2 5cm of the tubing extends past the end of the cable retainer 5 Position the exposed ribbon cable of the panel bus jumper in the flat retainers on th...

Страница 5: ...ided Figure 3 Figure 3 Installing the Shelf in the Rack 2 Connect the panel bus jumper to the nearest connector on the panel bus Figure 4 Note The connector is keyed The polarized tab on the jumper connector fits into the opening in the header connector on the panel bus Important Make sure that the jumper connector is fully seated in the header connector on the panel bus Figure 4 Connecting the Pa...

Страница 6: ...on the trough over the faceplate and tighten the two screws Figure 5 3 Install an adhesive backed wire retainer provided on each end of the trough as shown in Figure 5 Note Each wire retainer can hold up to 6 duplex patch cords Figure 5 Installing the Trough on the Shelf Step 5 Installing Cable Directions are provided in the sub sections below for preparing the fiber optic cable and connecting it ...

Страница 7: ...red fibers and the jacketed end of the cable through a round hole in the back of the shelf Figure 7 Note When stacking several shelves in the same rack alternate use of the left and right cable entry holes for routing cables into the shelves 6 Slide the liquid tight lock nut onto the buffered fibers and the jacketed end of the cable Figure 7 7 Hold the liquid tight cable fitting so that the thread...

Страница 8: ...lice organizers ordered separately you will need to install four splice organizers using the splice organizer holders provided To install four mass fusion splice organizers 1 Cut a 3 inch 7 5cm piece of double sided tape provided with the shelf 2 Apply the piece of tape to the underside of one of the splice organizer holders also provided with the shelf 3 Insert two splice organizers into the hold...

Страница 9: ...u are making splice the incoming buffered fibers to the pigtail 3 For fusion splices use your fingers to place the splices in the splice organizers ordered separately in the recommended sequence shown in Figure 9 Note The numbers shown in Figure 9 do not appear on the actual splice organizers Note Each fusion splice organizer has four spare positions For rotary mechanical splices use a 1012A compr...

Страница 10: ...com Page 10 of 13 4 Dress the fibers as shown in Figure 10 and route the slack around the storage drums 5 Connect the pigtail connectors to the adapters on the back of the faceplate Figure 10 Positioning the Splices and Fibers Pigtail Faceplate ...

Страница 11: ...ers 2 Affix the 2 adhesive backed wire retainers to the shelf approximately in the position shown in Figure 11 3 Route the buffered fibers through the wire retainers and around the storage drums to the adapters on the back of the faceplate Figure 11 4 Connect the terminated fibers to the adapters on the back of the faceplate Figure 11 Routing the Terminated Fibers Terminated fibers Faceplate Wire ...

Страница 12: ...le tie holder and retain the incoming fiber optic cable to the cable support Important Do not tighten the cable tie completely Leave enough slack so that the cable moves freely when you slide the shelf out from the rack 3 Secure the incoming fiber optic cable to the back of the rack approximately 7 inches about 18cm above the shelf Figure 12 4 Slide the shelf out of the rack and back in making sur...

Страница 13: ...which is made of clear flame retardant plastic slides on and off the shelf To install the cover Slide the cover through the flanges on the shelf until the cover reaches the back wall of the shelf Figure 13 Important Dust covers are installed in the ports to protect the fibers connected to the back of the faceplate Do not remove the dust cover from a port until you connect a patch cord to that port...

Отзывы: