4.8 COMMISSIONING PROCEDURES
System commission can commence after the monitoring system has initialized. (e.g. when MCU LED
L4 is off and L3 begins to flash). The commission procedure is as follow:
Commissioning Tasks
Observation
1. On-line & inquiry status
z
Enter into TB-1800 Main window. Initialization of monitoring
system will be up in about 2 minutes, at that time, on MCU L4
is off and L3 begins to flash. Click ‘online’ button and inquiry
the TB-1800’s status. Go to next step if there is no alarm.
Else or, check the point of failure and handle the alarm.
z
Set site address and alarm report mode.
2. Set On/off Status / channel
number/ gain
z
Click ‘ON’ of Soft switch and set site ID, telephone number as
well as channel number of the TB-1800’s operating
frequency.
3. Set monitoring system
parameters
4. Measuring power
z
Check downlink input power whether can satisfy design
requirements
5. Test DL output power and
adjust DL ATT level
z
Set the DL ATT to the optimal level to avoid saturating the DL
PA or to satisfy design requirement.
Table 11: Commissioning procedures
4.9 REMOTE MONITORING USING OMC (OPTIONAL)
OMC offers flexibility to manage a network of equipment, all the tasks carried out by the OMT can
performed centrally from the OMC terminal.
In order for OMC to communicate to each equipment, a unique equipment identification must be
referred to, and it is entered using OMT after local commission has been completed. The identifier is
known as ‘Device ID’, and is an alpha-numeric string composed of six characters.
z
Enter the unique device ID value into the ‘Site Address’ field and select ‘Set’
End of section