IM-NT-2.3
Operator Guide ©ComAp
– January 2018
13
IM-NT-2.3 Operator Guide.pdf
BTB Measurement Screens Description
Measurement CU Screen
1. Dead bus
2. Left bus voltage ph-n
3. Left bus voltage ph-ph
4. Right bus voltage ph-n
5. Right bus voltage ph-ph
6. Synchronization enable
7. Import power
8. Bus left power factor
1. Operation mode of the gen-set
2. Signalizes if any remote
connection to controller is active
3. Indication of active alarm
4. Application status
5. Timer
– event’s counting time
(e.g. syncronization timeout)
6. Time of timer
7. BusLImport
OFF MAN AUT
BTB on
R !
0 kW
No Timer
0
1
2
3
4
5
6
7
0 V 228 V
0 V 0 V
0kW
0.00
D
R
1
2
3
4
5
6
8
7