
Upgrade Procedure, xx09 MK2
Page 14 of 64
Document No
132622 Rev B
Form # 117140-B
Coarse balance configuration drawings
Description
CURRENT
Configuration
MK2
Configuration
BALANCE WEIGHT KIT, EL & CL, 4009-11
130621-1
131921-1
BALANCE WEIGHT KIT, EL & CL, 4009-17
130338-1
131922-1
BALANCE WEIGHT KIT, EL & CL, 4009-23
130586-1
See Next row
BALANCE WEIGHT KIT, EL & CL, 4009-33
130548-1
BALANCE WEIGHT POSITIONS, 4009-23/33
MK2 UPGRADE
134094-1
BALANCE WEIGHT KIT, EL & CL, 5009-11
130157-1
132412-1
BALANCE WEIGHT KIT, EL & CL, 5009-17
129993-1
131795-1
BALANCE WEIGHT KIT, EL & CL, 5009-23
130375-1
See Next row
BALANCE WEIGHT KIT, EL & CL, 5009-33
130376-1
BALANCE WEIGHT POSITIONS, 5009-23/33
MK2 UPGRADE
TBD
BALANCE WEIGHT KIT, EL & CL, 6009-11
130664-1
131965-1
BALANCE WEIGHT KIT, EL & CL, 6009-17
130654-1
131966-1
BALANCE WEIGHT KIT, EL & CL, 6009-23
130608-1
See Next row
BALANCE WEIGHT KIT, EL & CL, 6009-33
130295-1
BALANCE WEIGHT POSITIONS, 4009-23/33
MK2 UPGRADE
TBD
1.1.13.
Turn the pedestal power supply ON. The brakes on the Elevation and Cross-Level motors will release. A
brake release power supply control circuit supplies 24 VDC to the brakes initially (5-10 seconds) and then
reduces the voltage to 12VDC. The PCU will initialize the stabilized portion of the mass to be level with the
horizon and at a prescribed Azimuth and Elevation angles in the specific sequence of steps listed below.
Antenna Initialization
Initialization is completed in the following phases, each phase must complete correctly for the antenna to
operate properly (post-initialization). Observe the Initialization of the antenna pedestal.
Step 1. Elevation axis activates - Input from the Elevation sensor is used to drive the Elevation of
the equipment frame to 45.0 degrees in elevation.
Step 2. Cross-Level axis activates - Input from the Cross-Level sensor is used to drive Cross-Level
of the equipment frame to bring it to level (this results in the tilt of the Cross-Level Beam being
level).
Step 3. Azimuth axis activates - Antenna drives CW in azimuth until the “Home Flag” signal is
produced. This signal is produced by a Proximity sensor in close proximity to a metal tab. After a
short period of time (a total of approximately 1-2 Minutes after power is initially applied to the
antenna), the PCU will report its model setting and software version number to the Antenna
Control Unit (ACU).
This completes the phases of initialization. At this time the antenna elevation should be at 45.0 degrees
and Relative azimuth should be at home flag (proximity sensor at the trailing edge of the metal tab in the
azimuth assembly).
Содержание Sea Tel 09 Series
Страница 1: ......
Страница 29: ......
Страница 36: ...Upgrade Procedure xx09 MK2 Page 36 of 64 Document No 132622 Rev B Form 117140 B DWG Pg 1 NOT AVAILABLE YET...
Страница 44: ......
Страница 46: ......
Страница 48: ...Upgrade Procedure xx09 MK2 Page 48 of 64 Document No 132622 Rev B Form 117140 B DWG Pg 1 NOT AVAILABLE YET...
Страница 49: ...Upgrade Procedure xx09 MK2 Page 49 of 64 Document No 132622 Rev B Form 117140 B DWG Pg 1 NOT AVAILABLE YET...
Страница 51: ......
Страница 55: ......
Страница 59: ......
Страница 61: ......
Страница 63: ...Upgrade Procedure xx09 MK2 Page 63 of 64 Document No 132622 Rev B Form 117140 B DWG Pg 1 NOT AVAILABLE YET...
Страница 64: ...Upgrade Procedure xx09 MK2 Page 64 of 64 Document No 132622 Rev B Form 117140 B DWG Pg 1 NOT AVAILABLE YET...